My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
7/16/2020 8:57:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
black moly grease to the polypak as shown. Make <br /> STEP 5: SAND THE UPPER DROP TUBE sure coverage is completely around the polypak <br /> Sand the inside of the drop tube with sandpaper seal. <br /> and/or steel wool to remove all burrs and sharp <br /> edges. After sanding wipe down the inside of the Ensure polypak <br /> tube with a clean rag from the top to approximately 4 lip is up <br /> inches down to remove any debris. , <br /> Caution: Failure to properly chamfer, sand, and <br /> clean the drop tube may cut the seal and result Inlet <br /> in a failure of a pressure decay leak test. <br /> Tube i\ Polypak <br /> Apply grease <br /> around polypak <br /> Figure 7 <br /> STEP 8: INSTALL INLET TUBE <br /> Insert the inlet tube into the upper tube until the <br /> upper tube seats against the flange on the inlet tube. <br /> Fine grit sandpaper Ensure polypak is inserted evenly and stays in inlet <br /> Figure 5 tube groove. <br /> STEP 6: APPLY GREASE TO DROP TUBE <br /> Apply black moly grease to the inside diameter of <br /> the upper drop tube. Make sure coverage is <br /> completely around the tube as shown in Figure 6. <br /> Figure 8 <br /> SEE PAGE 8 FOR INSTRUCTIONS USING THE <br /> 71 SO-TOOL. <br /> SEE PAGE 9 FOR INSTRUCTIONS USING THE <br /> Figure 6 71 SO-TOOLC. <br /> STEP 7: APPLY GREASE TO POLYPAK SEAL <br /> Ensure that the polypak seal is installed on the inlet <br /> tube with the lip up as shown in Figure 7. Apply <br /> 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.