Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> XII.LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N N/A <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? N ❑ ❑ <br /> (Check all that apply.)Simulated leak rate verified: ® 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br /> Was the test apparatus properly calibrated? ® ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ N <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ N <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or N ❑ ❑ <br /> disconnected? <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a N ❑ El <br /> test? <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? N ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? N ❑ ❑ <br /> For any answer of"N"above,describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH Monitoring is NOT used.(Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) N Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Components)Monitored By This Sensor Sensor Functionality Interstitial <br /> Test Communication Test <br /> Sl 87 Product ® Pass ❑ Fail ® Pass ❑ Fail <br /> 52 91 Product ® Pass ❑ Fail ® Pass ❑ Fail <br /> S3 Vent ® Pass ❑ Fail ® Pass ❑ Fail <br /> S4 Vapor ® Pass ❑ Fail I ® Pass ❑ Fail <br /> S5 DSL Product ® Pass ❑ Fail I ® Pass ❑ Fail <br /> S6 DSL Vent ® Pass ❑ Fail I ® Pass ❑ Fail <br /> ❑ Pass ❑ Fail 10 Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ® Simulated Leak at Far Ends of the Interstitial Space ❑Visual Inspection <br /> ❑ Other(Describe the method in Section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in interstitial spaces? N Yes ❑ No(Describe the reason in section XV below.) <br /> For any answer of"Fail'above,describe in Section XV how and when these issues were or will be corrected. <br /> XV.COMMENTS <br />