Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N N/A <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats ® ❑ ❑ <br /> move freely,functionality tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not ® ❑ ❑ <br /> interfere with their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionality tested,and confirmed operational? ® ❑ ❑ <br /> Does the flow if fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or ® ❑ ❑ <br /> is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down?(Check all that apply) ® Sump ® under-Dispenser <br /> Containment <br /> If alarms are relayed to'a remote monitoring station,is all communications equipment(e.g.,modem)operational? ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed.(Do not complete this section) Y N N/A <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, ❑ ❑ ❑ <br /> including testing for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue build up to ensure that floats move ❑ ❑ ❑ <br /> freely,functionally tested,and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> El <br /> Were all items on the equipment manufacturer's maintenance checklist completed? El ❑ <br /> For any answer of"N"above,describe in Section X1 how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br />