My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:05:05 AM
Creation date
7/20/2020 10:41:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name : Costco # 1091 Lodi (Page 3 ) <br /> In-Tank Gauging . <br /> ?❑ Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if no tank gauging or SIR equipment is installed and disregard the following section . <br /> Com lete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination , including testing for ground <br /> faults ? <br /> El Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup ? <br /> ❑ Yes No* Was accuracy of system product level readings tested ? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested ? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed ? <br /> * In the Section H , below, describe how and when these deficiencies were or will be corrected . <br /> G . Line Leak Detectors ( LLD) , <br /> ❑ Check this box if LLDs are not installed and disre and the following section . <br /> Yes ❑ No* For equipment start- up or annual equipment certification , was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph . ; ❑ 0 . 1 gph ; ❑ 0 . 2 <br /> h . <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements ? <br /> ® Yes ❑ No Was the testing apparatus properly calibrated ? <br /> Yes ❑ No* For mechanical LLDs , does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A is disabled or disconnected ? <br /> ( Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ® Yes ❑ No For electronic LLDs, have all accessible wiring connections been visually inspected ? <br /> ❑ N/A <br /> [X� Yes ❑ No * Were all items on the equipment manufacturer's maintenance checklist completed ? <br /> In the Section H , below, describe how and when these deficiencies were or will be corrected . <br /> H . Comments : <br />
The URL can be used to link to this page
Your browser does not support the video tag.