Laserfiche WebLink
ADDITIONAL ASSESSMENT WORKPLAN <br /> JAY'S MINI-MART, STOCKTON <br /> APRIL 2002 <br /> WORKPLAN PREPARATION <br /> Firm Preparing Workplan <br /> GHH Engineering, Inc. <br /> 11960 Heritage Oak Place #2B <br /> Auburn, California 95603 <br /> Workplan Prepared by: <br /> { This workplan was prepared by GHH Engineering(GHH). Mr. Thomas E. Ballard,Principal <br /> Geologist(RG#7299), is the qualified person responsible for overseeing this project. This <br /> workplan was written by Dr. John N. Church, Geologist, and reviewed for technical content by <br /> Mr. Ballard. <br /> The recommendations submitted in this workplan are based upon the best available information <br /> E obtained from the field investigation, persons knowledgeable about the site, and local <br /> government agencies. All information presented is believed to be factual unless proven <br /> otherwise. <br /> If you have any questions or need additional information, please call the undersigned at(530) <br /> r 886-3100. <br /> Thank you, <br /> John N. Church, Ph. D. ,�r�aED GF <br /> Geologist b�5 o <br /> I v(I�0 �d�CA � NQS • <br /> Thomas E. Ballard,R.G. y <br /> Project Manager �`�oFoQ�* <br /> CA41F <br /> F A5213VC\1n\AAWP0402 <br /> ti pc: Mr. Marty Hartzell,Regional Board <br /> Mr. Sam Savig, San Joaquin County Environmental Health'Department <br /> a <br />