Laserfiche WebLink
Qzone Injection Pilot8bidy',WkPlat _ <br /> MANTECA CITY CORPORATION YARD <br /> 210 East Wetmore-Street, Manteca, California <br /> J . <br /> 1.0. u .INTRODUCTION AND SCOPE.OF WORK . _ <br /> At the requestofMr. Frederic Clark of the City of Mabl eca and.by direction frorn the San Joaquin, <br /> County Environmental Health Department. (EHD) by letter dated; 05 January.2004, Advanced. :. <br /> Oeo'Environmental, Inc. (AGE), has prepared this Ozo c Injection Pilot-Study Work Plan for.210. <br /> East Wetmore Street(site),Manteca,California.'The scow ofthe work includes installation of ozone <br /> injection well points(diffusers),installation.o f an,ozone' .j ection network/system and operation and- <br /> monitoring of the:system for up td.six months: <br /> The, work'plan was prepared in accordance with gui elines" established-by"the Central Valley <br /> Regional Water. Quality Control Board-,(CVRWQ B) for the subsurface investigation 'of <br /> underground`storage tank (UST) sites:_- <br /> 2.0.' BACKGROUND <br /> The site is located in a commercial/industrial area of-So th Manteca,California;'at an approximate <br /> elevation of 35 feet above mean sea level. The site is resently occupied by the-City of Manteca <br /> Corporation Yard.Currently the site operates above-ground fuel storage tanks(ASTs)that have been `- <br /> -_ installed'.over the former UST pit location.There are no 6 her-apparentsource areas for the identified <br /> contaminants on the site. The site setting is.illustrated] Tigure-l. The layout of the-property and <br /> locations of wells,and soil borings are depicted in Figu a 2. <br /> Mass balance calculations indicate that there is approxim itely 1,1-$4,330 gallons ofMTBE-impacted - <br /> ground water.and .an.-estimated 0.72 gallons of.MTBE dissolved in the'.ground water.at.the site. <br /> Figure 3 shows the average MTBE concentrations"in gro nd water at the site.since sampling began.. <br /> The mass balance calculation is presented in Appendix A` Further background inforrilation including <br /> the site history,description and results of previous.inve tigations are'detailed in the AGE-prepared <br /> Corrective Action-Plan-(CAP) dated 07 November 200 - <br /> . 3.Q. '-SCOPE OF WORK _ A <br /> The scope of work will consist of the following Masks: <br /> Permitting, planning and pre-field work aetiviti s <br /> Drilling and installation of eight shallow ozone 3parge wells; �- <br /> Installation of an ozone sparge system; and - <br /> Preparation of a report of findings.- <br /> Advanced Geo Environmental,Inc. <br />