Laserfiche WebLink
05 March 2004 <br /> AGE-NC.Project No. 96-0254: <br /> Page 2 of 5 <br /> Each of these.tasks are discussed-below in.detail. . . ` <br /> 3.L PERMITTING AND PRE-FIELD WORK AC, IVITIES <br /> A site.assessment soil boring permit will be obtained.fr m the San Joaquin County Environmental - <br /> Health Department,(EHD). A'site specific Health and Safety Plari:Will be prepared-in accordance' <br /> with, Occupational-Safety and Health Guidance Ma ual for_Hazardous Waste..'Site.Activities <br /> (National:Institute for 'Occupational- Safety,and .Heal Lh ,Administration) and federal (29 CFR _ = <br /> 1910.120) and state (Title 8, Cal. Code Reg.; Section 5 92) regulations. The:SHSP will cover:. <br /> • Health and safety officer and keypersonnel;and personnel requirements. <br /> and responsibilities. <br /> • .Field activities, overall work'practices and sten and operating procedures (SOP). <br /> • On-site ehernicals and potential hazardous subs.an as well as physical`Hazards:' <br /> • Risk analysis for existing site conditions,and-de scription of personal protective equipment <br /> to be.used.by personnel. <br /> • Site control measures,including work zones and ecuritymeasures,and entry procedures for <br /> confined spaces: . <br /> • Exposuremonitoring plan with monitoring methods, emergency response plan.addressing <br /> hazardous material/waste releases, and medical surveillance requirements. <br /> All field personnel will be.trained in hazardous materials communication and will have completed <br /> a 40-Hour Health and-Safety Course.as specified in OSHA Hazardous Waste Operations: and <br /> Emergency Response Standard [29 CER 1910.120(e) , and 8-hour annual=refresher courses-as <br /> necessary- :. <br /> Site-specific information regarding the-rclease ofcb&ni als into the subsurface will be provided'to- <br /> ihe general public', in the form of postings at.the si.e. Additional information, regarding .site.. _ <br /> information will:provided to parties upon requestwere aid when available.AGE will distribute this <br /> information:and data by certified mailings. _ <br /> Prior to mobilization,. each.soil.boring location will el clearly-marked and -a.utility clearance . <br /> obtained through Underground Service Alert. _ <br /> 3.2. IN-SITU-OZONE SPARGING WELL,INSTAL 'ATION <br /> Eight pilot-borings will be advanced for the installation of,.ozonesparge diffusers;=at locations <br /> depicted ori Figure 3: The proposed ozone sparge wells ill be screened through the water table and <br /> ground water to address the MTBE-impacted ground-w ter at the site. Proposed..'-well locations and' <br /> Advanced GeoEnvironmental,Inc. - <br />