My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PANOCHE BURN SITE REMEDIATION <br /> TABLE 3 <br /> Project Participants <br /> Name and Organization Function <br /> Daniel Shane, Federal On-Scene Coordinator Federal Coordinator for the Panoche tire fire and <br /> U.S. Environmental Protection Agency, Region IX environmental remediation <br /> Todd Thalhamer, Project Engineer CIWMB project engineer for Phase II of the remediation <br /> California Integrated Waste Management Board design and construction <br /> Bob Logan, Construction Manager CIWMB's engineering consultant, onsite construction <br /> CH2M HILL engineer <br /> Dave Grattan, Project Manager CIWMB's cleanup contractor responsible for the <br /> Jim Hasal, Site Superintendent construction of the cover and erosion control devices <br /> Sukut Construction Company <br /> Susan Boraston, Industrial Hygienist Sukut's health &safety subcontractor, responsible for <br /> SP Environmental Services health&safety monitoring <br /> Dean Bradfield, Inc. Supplier of erosion blankets <br /> Reed&Graham, Inc. Supplier of 8-oz. geotextile <br /> Serrot Corporation Sukut's geomembrane subcontractor and supplier <br /> Quality Hydroseeding Sukut's hydroseeding subcontractor <br /> Fence Masters Contractors Sukut's fencing subcontractor <br /> ECCO Equipment Rental Sukut's equipment supplier <br /> Allen&Sons Construction Sukut's retention dam subcontractor <br /> Psomas and Associates CH2M HILL's subconsultant for project surveying and <br /> recording <br /> Twining Laboratory, Inc. Soil laboratory for CH2M HILL <br /> Sparger Technology, Inc. Certified hazardous waste laboratory for CH2M HILL <br /> 3.2 Remediation Activities <br /> On October 17, 1996, under direction from the CIWMB and its engineering consultant, <br /> CH2M HILL, Sukut Construction began to remediate the site. The purpose of the project was <br /> to encapsulate approximately 15,000 cubic yards of tire ash onsite before the winter rains. <br /> The project encompassed removing the ash from the side slopes and lower canyon; <br /> excavating oil-saturated soil; consolidating the ash residue in the upper western canyon; <br /> placing a compacted monolithic, 5-foot clay cover over the ash material; installing erosion <br /> protection devices; and constructing a retention basin. Sukut Construction performed <br /> remediation under Contract IWM-05050 while the design and construction management was <br /> performed by CH2M HILL and the CIWMB under Contract IWM-C5051. <br /> The project lasted 20 weeks and was completed on February 4, 1997, after repairing the <br /> erosion damage from the January 1997 storms. <br /> CIWMB 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.