My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Project Costs <br /> The CIWMB tracked both consultant and contractor costs for the remediation. Total costs for <br /> Phase H of the Panoche Burn Site Remediation were $159,810 for engineering and $487,994 <br /> for remediation. Table 10 summarizes the consultant services and authorized expenditures. <br /> TABLE 10 <br /> Consultant Expenditures <br /> Work <br /> Order Tasks Budget <br /> CM-11 Site Survey and Base Map $9,499 <br /> CM-12 Design Report and Sampling $26,527 <br /> CM-13 Construction Management and Final Report $72,000 <br /> CM-13a Additional Construction Support due to Pyrolytic oil and storm damage $24,134 <br /> CM-14 Final Site Survey and Draft As-Built $10,470 <br /> CM-15 Record of Survey and Reproduction $5,900 <br /> CM-16 Completion of As-Built Drawings& Report $11,280 <br /> Total Expenditures $159,810 <br /> Table 11 summarizes contractor expenses and tasks for remediation of the Panoche Burn <br /> Site. <br /> TABLE 11 <br /> Contractor Expenditures <br /> Work <br /> Order Tasks Budget <br /> SK-C1 Work Plan and Health and Safety(H&S) Plan $ 14,485 <br /> SK-C2 Site Remediation and H&S Monitoring $434,823 <br /> SK-C3 Storm Damage Repair and Additional Erosion Control $ 38,686 <br /> Total Expenditures $487,994 <br /> CIWMB 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.