Laserfiche WebLink
4. Project Costs <br /> The CIWMB tracked both consultant and contractor costs for the remediation. Total costs for <br /> Phase H of the Panoche Burn Site Remediation were $159,810 for engineering and $487,994 <br /> for remediation. Table 10 summarizes the consultant services and authorized expenditures. <br /> TABLE 10 <br /> Consultant Expenditures <br /> Work <br /> Order Tasks Budget <br /> CM-11 Site Survey and Base Map $9,499 <br /> CM-12 Design Report and Sampling $26,527 <br /> CM-13 Construction Management and Final Report $72,000 <br /> CM-13a Additional Construction Support due to Pyrolytic oil and storm damage $24,134 <br /> CM-14 Final Site Survey and Draft As-Built $10,470 <br /> CM-15 Record of Survey and Reproduction $5,900 <br /> CM-16 Completion of As-Built Drawings& Report $11,280 <br /> Total Expenditures $159,810 <br /> Table 11 summarizes contractor expenses and tasks for remediation of the Panoche Burn <br /> Site. <br /> TABLE 11 <br /> Contractor Expenditures <br /> Work <br /> Order Tasks Budget <br /> SK-C1 Work Plan and Health and Safety(H&S) Plan $ 14,485 <br /> SK-C2 Site Remediation and H&S Monitoring $434,823 <br /> SK-C3 Storm Damage Repair and Additional Erosion Control $ 38,686 <br /> Total Expenditures $487,994 <br /> CIWMB 37 <br />