My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 <br /> 300.5 Contact Information/ List of Responsible Parties <br /> The following is contact information for all issues regarding the project, and should be contacted in the order listed: <br /> Address City, State Zip Phone Number <br /> Project Office 29425 MacArthur Blvd Tracy, CA 95376 209-832-4863 <br /> King Bailey (WPCM) 29425 MacArthur Blvd Tracy, CA 95376 714-329-0144 (cell) <br /> Jeannine Winters (Project Engineer) 29425 MacArthur Blvd Tracy, CA 95376 209-814-0054 (cell) <br /> Rick McCourt (SWPPP Preparer) 4010 W Chandler Santa Ana, CA 92704 714-460-1034 (cell) <br /> Jerry Pabbruwee (VP— Engineering) 4010 W Chandler Santa Ana, CA 92704 714-540-5351 x 1029 <br /> Mike Crawford (CEO) 4010 W Chandler Santa Ana, CA 92704 714-540-5351 x 1008 <br /> Note: Water Pollution Control Manager (WCPM) is responsible for the following items and has authority to take actions necessary to ensure <br /> compliance with the provisions of this SWPPP: <br /> ■ Implementation of all materials, waste and non-storm water management activities such as monitoring, dewatering, diversions, general <br /> site clean-ups, vehicle and equipment refueling, cleaning and maintenance, spill control, etc. <br /> ■ Pre-storm inspections <br /> ■ Post-storm inspections <br /> ■ Storm event inspections <br /> ■ Preparing annual compliance certification <br /> ■ Ensuring elimination of all unauthorized discharges <br /> ■ Mobilize crews in order to make necessary repairs to control measures <br /> ■ Coordinate with CIWMD to assure all necessary corrections and repairs are made immediately <br /> ■ Ensure the project complies with this SWPPP, the General Construction Permit and approved plans at all times <br /> Prepared: April 12, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.