My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 <br /> a .� <br /> 1 z ! 4/*F'- <br /> 174�- <br /> '; dw <br /> tf 6V <br /> 4 F, <br /> Figure 1 Figure 2 <br /> 300.3 Construction Site Estimates <br /> The following are estimates of the construction site: <br /> ■ The site measures approximately 2,100 feet along the north/south axis by 1,600 feet at its <br /> widest point along the east/west axis (approximately 56 acres) <br /> ■ The northern 1/3 of the site tapers to a point at its northern most boundary <br /> ■ Total site fill (includes burn pile backfill) = 139,000 CY <br /> ■ Burn pile backfill = 55,000 CY <br /> ■ Total available cut = 81,000 CY <br /> ■ Adjust borrow area excavations are required to balance earthwork & maintain grades <br /> ■ Burn pile backfill volume based on surveyed burn pile areas and 3 feet excavations <br /> Since there are no storm water outflows, no calculations have been provided. <br /> 300.4 Project Schedule/ Water Pollution Control Schedule <br /> Site preparation begins (Phase 1): Mar 20, 2003 <br /> Rainy season ends: Apr 30, 2003 <br /> Submit Annual Recertification of SWPPP Jun 15, 2003 <br /> Soil remediation begins (Phase 2): Jul 15, 2003 <br /> Implement construction BMP's for rainy season: Sep 15, 2003 <br /> Rainy season begins: Oct 1, 2003 <br /> Project Finished Feb 15, 2004 <br /> Prepared: April 12, 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.