Laserfiche WebLink
Page 11 <br /> a .� <br /> 1 z ! 4/*F'- <br /> 174�- <br /> '; dw <br /> tf 6V <br /> 4 F, <br /> Figure 1 Figure 2 <br /> 300.3 Construction Site Estimates <br /> The following are estimates of the construction site: <br /> ■ The site measures approximately 2,100 feet along the north/south axis by 1,600 feet at its <br /> widest point along the east/west axis (approximately 56 acres) <br /> ■ The northern 1/3 of the site tapers to a point at its northern most boundary <br /> ■ Total site fill (includes burn pile backfill) = 139,000 CY <br /> ■ Burn pile backfill = 55,000 CY <br /> ■ Total available cut = 81,000 CY <br /> ■ Adjust borrow area excavations are required to balance earthwork & maintain grades <br /> ■ Burn pile backfill volume based on surveyed burn pile areas and 3 feet excavations <br /> Since there are no storm water outflows, no calculations have been provided. <br /> 300.4 Project Schedule/ Water Pollution Control Schedule <br /> Site preparation begins (Phase 1): Mar 20, 2003 <br /> Rainy season ends: Apr 30, 2003 <br /> Submit Annual Recertification of SWPPP Jun 15, 2003 <br /> Soil remediation begins (Phase 2): Jul 15, 2003 <br /> Implement construction BMP's for rainy season: Sep 15, 2003 <br /> Rainy season begins: Oct 1, 2003 <br /> Project Finished Feb 15, 2004 <br /> Prepared: April 12, 2003 <br />