Laserfiche WebLink
Page 29 <br /> Attachment G Program for Maintenance, Inspection and Repair of BMP's <br /> BMP BMP Title Frequency Maintenance / Repair <br /> No <br /> SS-1 Scheduling Weekly ■ Incorporate BMP's into schedule <br /> SS-2 Preserve Existing Vegetation Daily ■ Restrict operators to work area <br /> SS-9 Earth Dikes Weekly ■ Check for breaks / leaks <br /> SC-8 Sand Bag Barrier Weekly ■ Replace broken bags. Add bags as required <br /> WE-1 Wind Erosion Control Daily ■ Water truck on roads & excavations <br /> TC-1 Stabilized Construction Entry Daily ■ Regrade & replace gravel as needed <br /> ■ Sweep on MacArthur Blvd as needed <br /> NS-1 Water Conservation Practices Daily ■ Restrict use in all areas <br /> NS-8 Vehicle & Equipment Cleaning Daily ■ Use pressure washer for decon <br /> NS-9 Vehicle & Equipment Fueling Daily ■ Ensure drip buckets are used <br /> NS-10 Vehicle & Equipment Maint Daily ■ Use catch pans & drip buckets daily <br /> WM-1 Material Delivery & Storage Weekly ■ Use container for storage of items <br /> WM-4 Spill Prevention & Control Daily ■ Contain and clean spills <br /> ■ Manifest all wastes transported <br /> WM-5 Solid Waste Mgmt Weekly ■ Cover dumpster when not used <br /> WM-6 Hazardous Waste Mgmt Daily ■ Cover bin when not used <br /> ■ Manifest all wastes transported <br /> WM-7 Contaminated Soil Mgmt Daily ■ Manifest all wastes <br /> WM-9 Sanitary / Septic Waste Mgmt Weekly ■ Clean slop & spills as required <br /> ■ Drum storage on containment pallet <br /> WM-10 Liquid Waste Mgmt Weekly . Manifest all wastes transported <br /> Prepared: April 12, 2003 <br />