Laserfiche WebLink
Page 30 <br /> Attachment H Storm Water Quality Inspection Checklist <br /> General Information <br /> Project Name Tracy Tire Fire Remediation Site <br /> Contract IWM-C2017 <br /> Number <br /> Contractor Sukut Construction, Inc. <br /> Inspector's <br /> Name <br /> Inspector's Title <br /> Signature <br /> Inspection Date <br /> ❑ Prior to forecast rain ❑ After a rain <br /> Inspection Type <br /> ❑ 24 hr Interval during extended rain ❑ Other <br /> Se❑on Rainy <br /> Storm start date/time Storm Duration <br /> Storm Data (HR) <br /> Time elapsed since Rainfall Amount <br /> last storm (HR) IN) <br /> BMP Title Yes No Corrective Action <br /> Scheduling <br /> Preserve Existing Vegetation <br /> Earth Dikes <br /> Sand Bag Barrier <br /> Wind Erosion Control <br /> Stabilized Construction Entry <br /> Water Conservation Practices <br /> Vehicle & Equipment Cleaning <br /> Vehicle & Equipment Fueling <br /> Vehicle & Equipment Maint <br /> Material Delivery& Storage <br /> Spill Prevention & Control <br /> Solid Waste Mgmt <br /> Hazardous Waste Mgmt <br /> Contaminated Soil Mgmt <br /> Sanitary/ Septic Waste Mgmt <br /> Liquid Waste Mgmt <br /> Prepared: April 12, 2003 <br />