My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tracy Tire Fire DRAFT <br /> November 20, 2000 <br /> The Work Plan has been organized as follows: <br /> Project Overview: contains details regarding the performance of the <br /> suppression work at the site and specific hazards that may be involved. <br /> Background: contains background information regarding the site and <br /> identifies points of access and site security. <br /> Scope of Services: details the procedures and safety guidelines to be <br /> utilized during the suppression effort. <br /> Project Schedule: proposed schedule for the suppression work. <br /> Cost Estimate: details the expected costs for the fire suppression. <br /> Health and Safety: Injury and Illness Prevention program prepared by <br /> Sukut Construction, Inc. Site Specific provisions appear in <br /> the body of this Work Plan. <br /> Appendices: A: The air-monitoring Report and test results. <br /> B: Suppression plan by independent contractor. <br /> Should you have any questions or comments with respect to this Work <br /> Plan, please do not hesitate to contact the undersigned. <br /> Sincerely, <br /> Sukut Construction, Inc. <br /> Scott Emery <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.