My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> 9. If hazardous material is encountered, Sukut shall notify the site engineer and/or <br /> IWMB immediately. Unknown contaminants will be evaluated by the IWMB <br /> before working in questionable areas. <br /> 10.The water source for fire suppression will likely be from municipal water via <br /> hydrants and trucked in by 4,000 gallon water trucks. <br /> 11.The suppression work (by SCI) will be performed entirely in level B safety. <br /> Should conditions warrant higher protective measures, an industrial hygienist will <br /> be consulted in accordance with OSHA guidelines. <br /> 12.Health monitoring will be provided by SP Environmental for dust, toxins due to <br /> smoke inhalation, and other pollutants. This monitoring program will be <br /> implemented in select areas where workers could potentially be subject to dust <br /> and smoke from the suppression activities. <br /> 13.Mobilization will consist of moving equipment, sanitary units and personnel to the <br /> sites and establishing water sources. Before starting work at a particular <br /> location, an introductory safety meeting will be held with all onsite personnel, and <br /> any onsite Agency personnel. <br /> 14.Of particular importance with respect to project safety will be the locating of all <br /> overhead power lines and any potentially "live" utilities. Special precautions will <br /> be necessary when working heavy equipment in the vicinity of public utilities. <br /> 15.Sukut will submit to IWMB an updated cost for the work which has been <br /> completed on a weekly basis. <br /> 16. November 20, 2000Minor traffic control will be implemented at the entrance to <br /> the project site. Typically cones and signs will be used to notify the general <br /> public of the truck traffic that will be entering and leaving the site. <br /> 17.Upon completion of the fire suppression we may incorporate some minor grading <br /> to better secure the site from vehicle traffic. Modifications will be made at the <br /> direction of the IWMB representative. <br /> LABOR & EQUIPMENT <br /> 18.The basic crew needed for the suppression of the Tracy Tire Fire is as follows. <br /> The listed equipment will likely be procured from local rental yards. Rates for <br />
The URL can be used to link to this page
Your browser does not support the video tag.