My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laboratory Control Sample <br /> There will be a mid-level calibration check standard analyzed on the GUMS <br /> at the end of each day of analyses as a laboratory control sample (LCS). <br /> The acceptance criteria for the calibration check standards will be ± 30% <br /> difference from the expected concentration for the target compounds. <br /> Internal Standards and Surrogates <br /> An internal standard and surrogate will be co-injected with every sample. <br /> Acceptance for the internal standard recovery will be —50% to 200%. <br /> Acceptance criteria for the surrogate will be 70% to 130% recovery. <br /> Respiratory Protective Equipment <br /> Sukut will initially outfit heavy equipment operators with airline respirators equipped with <br /> a 10-minute escape cylinder. The high-pressure cylinders supplying the air to the <br /> operators will be fitted to the particular piece of equipment the operator is using [i.e., <br /> dozer and excavator]. Ground personnel will be utilizing self-contained breathing <br /> apparatus [SCBA] to approximate the work area within the exclusion zone. All other site <br /> personnel will be confined to the support zone, where no personal protective equipment <br /> will be required. This plan is expected to continue throughout the entire work operations. <br /> Weather Station <br /> A Novel 110 WS14 Met Station will be utilized at the Tracy Tire Fire Suppression Project. <br /> The unit provides sufficient data, which includes, wind direction, wind speed, barometric <br /> pressure, relative humidity, and rainfall at intervals, which can be set from 1 minute tot <br /> hour. In addition, this station has a solar panel per option. Field Portable Analyttion, <br /> ical <br /> fFPA] will assist in selecting the appropriate location for the meteorological sta <br /> perform set-up and ensure its operation. FPA will train on-site personnel in the day-to- <br /> day operations of the Met Station including data download. After the initial visit and set <br /> up, FPA will continue to verify that the met station is in good working condition. In <br /> addition, should there be problems with the station in between visits, FPA personnel will <br /> be to get the station back on-line. <br /> Documentation and Recordkeeping <br /> A final report will be developed upon the completion of the project. This will include all <br /> sampling data and subsequent laboratory analytical results obtained during remedial <br /> operations at the Tracy Tire Fire Site. Additionally, meteorological data will also be <br /> presented in the final report. <br /> SP Environmental Services©November,2000 <br /> Air Monitoring Plan-DRAFT Page 7 of 7 Sukut Construction,Inc. <br /> Tracy Tire Fire Suppression Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.