Laserfiche WebLink
No Impact. Any generated wastewater will be transported off site or used as dust control <br /> pending analytical results. <br /> b. Require or result in the construction of new water or wastewater treatment facilities or <br /> expansion of existing facilities, the construction of which could cause significant <br /> environmental effects. <br /> No Impact. The construction of new water or wastewater treatment facilities or expansion <br /> of existing facilities will not be necessary. <br /> C. Require or result in the construction of new storm water drainage facilities or expansion <br /> of existing facilities, the construction of which could cause significant environmental <br /> effects. <br /> No impact. The construction of new storm water drainage facilities or expansion of <br /> existing facilities will not be necessary. <br /> d. Have sufficient water supplies available to serve the project from existing entitlements <br /> and resources, or are new or expanded entitlements needed. <br /> No impact. The proposed project will not require the acquisition of water supplies. On <br /> Site water from an installed production well will be used. <br /> e. Result in determination by the wastewater treatment provider which serves or may serve <br /> the project that it has adequate capacity to serve the projects projected demand in <br /> addition to the providers existing commitments. <br /> No Impact. The proposed project will not require any additional level of wastewater <br /> treatment. <br /> f. Be served by a landfill with sufficient permitted capacity to accommodate the projects <br /> solid waste disposal needs. <br /> No Impact. Excavated soil will be transported to licensed landfills. The landfill <br /> classification will be based on characterization of soil being transported. The used <br /> landfills will be capable of accommodating the capacity generated from the project site. <br /> g. Comply with federal, state, and local statutes and regulations related to solid waste. <br /> No Impact. Excavated soil will be transported and delivered to licensed landfills in <br /> accordance with all federal, state, and local statutes and regulations related to solid <br /> waste. <br /> Findings of Significance: <br /> ❑ Potentially Significant Impact <br /> ❑ Potentially Significant Unless Mitigated <br /> ❑ Less Than Significant Impact <br /> X No Impact <br /> 17. Mandatory Findings of Significance <br /> Describe to what extent the project would: <br /> 45 <br />