Laserfiche WebLink
the Site. Implementation of the proposed project will not trigger any mandatory findings of <br /> significance. <br /> C. Have environmental effects that will cause substantial adverse effects on human beings, <br /> either directly or indirectly. <br /> No impact. Potential environmental impacts of the proposed project have been evaluated in <br /> the Environmental Impact Analysis Sections 1 through 16 of this Initial Study.The project <br /> has been designed to avoid potential impacts to human beings as described previously in <br /> the project description section. Implementation of the proposed project will not trigger any <br /> mandatory findings of significance. <br /> Findings of Significance: <br /> ❑ Potentially Significant Impact <br /> ❑ Potentially Significant Unless Mitigated <br /> X Less Than Significant Impact <br /> ❑ No Impact <br /> V. DETERMINATION OF APPROPRIATE ENVIRONMENTAL DOCUMENT <br /> On the basis of this Initial Study: <br /> X I find that the proposed project COULD NOT have a significant effect on the environment.A <br /> NEGATIVE DECLARATION will be prepared. <br /> ❑ I find that although the proposed project COULD HAVE a significant effect on the <br /> environment, mitigation measures have been added to the project which would reduce these <br /> effects to less than significant levels. A NEGATIVE DECLARATION will be prepared. <br /> ❑ 1 find that the proposed project COULD HAVE a significant effect on the environment. An <br /> ENVIRONMENTAL IMPACT REPORT will be prepared. <br /> 916-255-3706 <br /> Christopher P.C. Sherman Project Manager Telephone# Date <br /> 916-255-3690 <br /> James Tjosvold NCCCOB Branch Chief Telephone# Date <br /> 47 <br />