Laserfiche WebLink
LFR Levine-Fricke <br /> • All land clearing, grubbing, scraping, excavation, land leveling, grading, cut and <br /> fill, and demolition activities shall have fugitive dust emissions effectively <br /> stabilized utilizing water application or by presoaking. <br /> • When materials are transported off site, all material shall be effectively wetted and <br /> covered to limit visible dust emissions, or at least 6 inches of freeboard space from <br /> the top of the container shall be maintained. <br /> • All operations shall limit or expeditiously remove the accumulation of mud or dirt <br /> from adjacent public streets at least once a month when operations are occurring. <br /> The use of dry rotary brushes should be limited except where preceded or <br /> accompanied by sufficient wetting to limit the visible dust emissions. <br /> • Following the addition of materials to, or the removal of materials from, the <br /> surface of outdoor storage piles, said piles shall have fugitive dust emissions <br /> effectively stabilized using sufficient water or chemical stabilizer/suppressant. <br /> • Traffic speeds on unpaved roads shall not exceed 15 mph. <br /> • To the extent feasible, the area subject to excavation, grading, and other <br /> construction activity at any one time will be limited. <br /> The following measures will be implemented as part of the proposed project to reduce <br /> the impacts of ozone precursor emissions from construction equipment exhaust. <br /> • When feasible, use alternative fuel construction equipment. <br /> • Minimize idling time to a maximum of 10 minutes when construction equipment is <br /> not in use. <br /> • To the extent practicable, minimize operation of heavy-duty equipment to reduce <br /> emissions. <br /> • When feasible, use low-emission on-site station equipment. <br /> With implementation of these measures,particulate emissions from fugitive dust and <br /> construction emissions during sediment excavation and removal activities will be <br /> reduced to a less-than-significant level. <br /> Formatted:Bullets and Numbering <br /> Biological Resources <br /> The following conservation measures will be implemented as part of the proposed <br /> project to avoid impacts to special status animal species having the potential to occur in <br /> the project area: <br /> • Project activities shall be performed during daylight hours. <br /> • Vehicles moving around the project site, including trucks and excavators, will <br /> remain to the fullest extent possible on existing access roads. In the event that a <br /> vehicle must travel off road to excavate existing burn piles, a qualified biologist <br /> will examine off-road areas to ascertain the best route to the burn piles. Once a <br /> Final_RAP_Tracy_9.18.03(final).doc Page 25 <br />