My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sb <br /> plan and accompanying health and safety documentation. At a minimum, the air <br /> monitoring plan will be updated whenever new personnel are added; remediation areas <br /> are changed; and/or equipment is added which in some way changes the current <br /> remediation activities. Ms. Boraston will be onsite approximately 2 days per week which <br /> includes attending the Wednesday weekly project meetings. In addition, an onsite Field <br /> Technician will be responsible for the collection of all employee exposure monitoring <br /> data during the remediation activities. <br /> SBES reports to LFR and is responsible for assuring on-site health and safety with regards <br /> to the chemical hazards found at the site. These include: <br /> 4- Assures that health and safety procedures in effect are in compliance with all <br /> appropriate federal, state as specified in this Site Specific HSP; <br /> Assures appropriate training of all onsite employees and subcontractors; <br /> 4- Maintenance of personnel exposure monitoring records; <br /> 4- Maintenance of site perimeter monitoring records; <br /> Maintenance of weather station monitoring records; <br /> Assesses if personal protective equipment is adequate for pre-determined on- <br /> site conditions. <br /> 1.4.2.1 Field Portable Ana!ytical (FPA] <br /> Field Portable Analytical Services (FPAj will be performing direct reading air <br /> monitoring for air quality on an intermittent basis during the Tracy Tire Fire <br /> Remediation Project. Specific locations will be monitored and will include on- <br /> site as well as perimeter locations. In addition, FPA will also be responsible for <br /> installing and monitoring, a Novel 110 WS14 Met Station that will be utilized at <br /> the TTFS. The unit provides sufficient data which includes; wind direction, wind <br /> speed, barometric pressure, relative humidity, and rainfall at intervals which can <br /> be set from I minute to I hour. An appropriate location for the meteorological <br /> station will be chosen_ <br /> I.5 Responsible Parties - Remediation Contractor <br /> 1.5.1 Sukut Construction, Inc. (Sukutl <br /> All Sukut personnel working during remediation operations at the Tracy Tire Fire Site are <br /> responsible and accountable to adhere to standard safety policies. Supervisory personnel <br /> and their responsibilities are listed below. The PM/Superintendent will be responsible for <br /> the effective implementation of all onsite health and safety requirements relating to the <br /> contractors scope of work. As PM, Mr. Bailey will oversee the work area and direct the <br /> Sb Environmental Services,LLC© October,2003 Calirornia Integrated Waste Management Board <br /> Site Specific Health and Safety Plan Page 6 of62 Tracy Tire fire Remediation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.