My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PR0535342
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
29425
>
4700 - Waste Tire Program
>
PR0535342
>
PR0535342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 5:32:38 PM
Creation date
7/22/2020 8:36:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
RECORD_ID
PR0535342
PE
4740
FACILITY_ID
FA0020390
FACILITY_NAME
RENEWED RESOURCES CORP
STREET_NUMBER
29425
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25312026
CURRENT_STATUS
02
SITE_LOCATION
29425 S MACARTHUR RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10992
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />,..asb <br /> 5.0 Site Control Program <br /> 5.1 Site Maps <br /> } The proposed project site is located at 29425 South MacArthur Drive, approximately 3 miles <br /> south of Tracy in San ►oaQuin County, California. The site is situated in the southwestern part of <br /> San ►oaquin County, and lies approximately V2 north of Interstate 580 (1-580) and <br /> i approximately 6 miles north of the Interstate 5 (I-5) and 1-580 interchange. Regional access to <br /> > the project site is provided by Interstate 205 (1-205), 1-580, and 1-5. Local access to the project <br /> site is provided by State Route 132, Coral Hollow Road, West Linne Road, and South MacArthur <br /> Dive. These streets are considered designated truck routes in accordance with the City of Tracy <br /> Municipal Code 3.08.310. <br /> > All personnel will become familiarized with the following site maps so that safe work practices, <br /> emergency and/or evacuation plans can be implemented promptly. These maps are provided in <br /> Appendix A. <br /> `I Figure I - Site Vicinity Map <br /> Figure 2 - Site Location Map <br /> Figure 3 - Hospital Route Map <br /> 5.2 Security and Safety <br /> y Transportation activities during project operations will be restricted to a specified haul route. <br /> Trucks and equipment leaving the site will exit and head north on South MacArthur Drive. <br /> ' Vehicles will then take a left turn at West Linne Road, and then left on Coral Hollow Road. This <br />- route will lead vehicles back to 1-580. Access to the site from 1-580 will be traveled in the <br /> ;) reverse order. The project does involve a minor short-term increase in vehicle traffic to <br /> mobilize equipment to and from the site. The mobilization of eQuipment on-site will not <br /> significantly increase traffic levels on South MacArthur Drive. <br /> ,= Excavation and off-site transportation of burned material, ash, and visibly affected soil and <br /> waste soil will be conducted with off-site eQuipment. Excavated material will be transported off- <br /> site via trucks. Site work will be conducted within the boundaries of the project area. A <br /> significant increase in vehicle exhaust emissions from the short-term mobilization of eQuipment <br /> is not expected. The project will not adversely affect existing roadways or intersections nor will <br />, ) it require the construction of additional roads. The slight increase in short-term traffic will not <br /> significantly increase traffic, pedestrian or bicyclist hazards. <br /> A full-time Project Superintendent, experienced in heavy construction and safety is assigned to <br /> this project. In summary, the person's duties include hazard recognition; accident prevention; <br /> new employee orientation [including subcontractors]; and the maintenance and supervision of <br /> the this site specific HSP as well as Sukut Construction Company's Illness and Injury Prevention <br /> Sb Environmental Services,LCC O October,2003 California integrated Waste Management Board <br /> Site Specific Health and Safety Plan Page 33 of 62 Tracy Tire Fire Remediation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.