My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
102
>
3500 - Local Oversight Program
>
PR0545890
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 10:55:34 AM
Creation date
7/22/2020 10:52:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545890
PE
3526
FACILITY_ID
FA0025958
FACILITY_NAME
ROEK BROTHERS CONSTRUCTION
STREET_NUMBER
102
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15502065
CURRENT_STATUS
02
SITE_LOCATION
102 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sock Instructions Page 2 of 8 <br /> 41 For the test, use a 5 foot section of pipe with an outside <br /> diameter 1/2 inch smaller than the source well's inside diameter. <br /> KEY REQUIREMENTS FOR INSTALLATION <br /> 6 SOCKS MUST BE INSTALLED WITII BLACK <br /> GROMMETS ON TOP <br /> Wrap Socks as independent units (see page 3, figure 5) <br /> A A maximum of 20 ea. 2-inch socks per section. <br /> 6, A maximum of 8 ea. 4-inch socks per section. <br /> 6 A maximum of 6 ea. 6-inch socks per section. <br /> 6 Make sure each sock is properly shaped (cylindrical and without <br /> bends) to facilitate ease of installation and removal. <br /> HELPFUL HINTS <br /> 6 ORC matrix hardens into a cement once hydrated <br /> 6 Minimize slack between each sock, by periodically pulling up <br /> slack while lacing <br /> 6 Tie off ORC retrieval lines to the well cap. Regenesis <br /> recommends the use of a 3/8" diameter x 6" long eyebolt. <br /> 41 The ORC Socks should be wetted to prevent excessive dusting <br /> prior to installation <br /> 41 Make sure your work area is clean to avoid oil and dirt deposits <br /> on the socks. <br /> http://www.regenesis.com/ORC/Instructions/SOCI(IIISII'ucliOlIS,htill 2/27/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.