Laserfiche WebLink
F <br /> Mr.Nuel Henderson,SJCEHD November 4,2005 <br /> Well Installation Work Plan <br /> ARCO Station 5469,Stockton,California <br /> Page 6 <br /> SCHEDULE <br /> Following approval of this Work Plan, a Well installation package will be forwarded to <br /> SJCEHD and the work will be scheduled. Approximately 4 weeks will .likely be <br /> necessary for a C-57 licensed contractor to become available. The SCM will be <br /> submitted within approximately 6 weeks of receiving'all analytical-results. <br /> If you have any questions or comments concerning this Work Plan, please contact Jay <br /> Johnson at(530) 676-6000. <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC. <br /> S CW <br /> Scott G. Bittinger, P.G. J: R. Jo son, P.G' <br /> Project Geologist <br /> Pro <br /> Project anager <br /> Attachments: Table 1 Drilling and Well Construction Summary <br /> Figure 1 Site Location'Map <br /> Figure 2 Site Plan <br /> Figure 3 Site Vicinity Map <br /> Appendix A Field Practices and Procedures <br /> cc: Paul Supple, Atlantic Richfield Corripany <br /> Cori Condon, California Regional Water Quality Control Board <br /> Vern Elarth,URS Corporation Americas <br /> KAl3p-Arco for URSI54691Work Plans\A=5469-well install workplan-2005.doc SrKATUS <br />