My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:52:40 PM
Creation date
7/22/2020 1:47:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> DRILLING AND WELL CONSTRUCTION SUMMARY <br /> ARCO STATION 5469 <br /> 130 SOUTH WILSON WAY <br /> STOCKTON,CALIFORNIA <br /> Boring Well <br /> Depth Boring Well Depth Screen Slot <br /> Boring No. (ft.) Dia.(in.) Well No. Dia.(in.) (ft.) (ft.bgs) Size(in.) Method Date Status <br /> B-I 61 10 MW-1 4 53 33-53 0.020 hollow stem auger 06/05/00 Active Well <br /> B-2 59 10 MW-2 4 53 33-53 0.020 hallow stem auger 06/06/00 Active Well <br /> B-3 59 10 MW-3 4 53 33-53 0.020 hollow stem auger 06/06/00 Active Well <br /> B-4 60 10 MW-4 4 59 34-59 0.020 hollow stem auger 06/07/00 Active Well <br /> B-5 54.5 10 MW-5 4 53 33-53 0.020 hollow stem auger 06/07/00 Active Well , <br /> B-6 54.5 10 MW-6 4 53 33-53 0.020 hollow stem auger 06/07/00 Active Well <br /> MW-7 53 10 MW-7 4 53 33-53 0.020 hollow stem auger 05/31/01 Active Well <br /> MW-8 53 10 MW-8 4 53 33-53 0.020 hollow stem auger 05/30/01 Active Well <br /> MW-9 74 10 MW-9 4 74 59-74 0.020 hollow stem auger 05/31/01 Active Well <br /> MW-10 74 10 MW-10 4 74 59-74 0.020 hollow stem auger 05/30/01 Active Well <br /> [W-1 58.5 8 IW-1 0.75 57.5 54-57.5 porous membrane hollow stem auger 03/26/02 Active Well <br /> IW-2 53.5 8 IW-2 0.75 53.5 51-53.5 porous membrane hollow stem auger 03/26/02 Active Well <br /> IW-3 58.5 8 IW-3 0.75 58.5 55-58.5 porous membrane hollow stem auger 03/25/02 Active Well <br /> IW-4 54.5 8 IW-4 0.75 54.5 52-54.5 porous membrane hollow stem auger 03/25/02 Active Well <br /> IW-5 64.5 8 lW-5 0.75 63 60.5-63 porous membrane hollow stem auger 03/25/02 Active Well <br /> CPT-] 120 2 cone penetrometer 11/18/02 Grouted to surface <br /> bgs=below ground surface <br /> ARC05469-drilling-well-summary Page 1 of I 5TKATIJ6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.