My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:58:54 PM
Creation date
7/22/2020 1:55:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn- <br /> ing plate against riser pipe approximately 1"below the <br /> adaptor. Tighten the tie wrap securely. The valve is <br /> now fully installed and in operating position. <br /> a <br /> NOTE: the warning plate includes important warn- <br /> ings,operating parameters,and listing information PW <br /> and must be installed. p A <br /> Rl,1� <br /> P�rA <br /> 00 <br /> .f <br /> ° Manufacturer:"OPW" <br /> POI <br /> Model:'71 SO-4" <br /> (4"represents size) <br /> Manufacture Date: <br /> "MFG MMYY" <br /> MM--Month YY=Year <br /> Warning <br /> Plate <br /> Figure 26-Product Identification <br /> Figure 25 <br /> STEP 26: VALVE REMOVAL <br /> The valve can be removed for tank leak testing,inspec- <br /> tion,etc.,by removing the Rotatable Product Adaptor, <br /> the 4" nipple,and the Jack Screw Kit. Reinstall per the <br /> above instructions. <br /> For testable models only: It is not necessary to re- <br /> move the valve to check poppet movement/function. <br /> See Page 17 for full testing details. <br /> STEP 27: ELECTRONIC LIQUID LEVEL MONITORING <br /> If an electronic level monitor is installed,it must be cali- <br /> brated to match the top of the 71 SO valve body,which <br /> must correlate with 95%of the actual tank capacity. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.