Laserfiche WebLink
POMECO Multi-Port Spill Container Manhole <br /> Installation Instructions 3. Remove the cover and measure the distance <br /> from the top of the tanks to the final grade. <br /> 1. Mark off finish grade. (See Figure 1.) <br /> 4. Cut the riser(s)from the underground tank so <br /> Finish Grade that both the fill and vapor risers are set below <br /> the final grade. Use the dimensions below: <br /> Spill Container Inches below grade (L) <br /> 5 Gal. Cast Iron Base 15'/2" <br /> Figure 1 5 Gal. Composite Base 17 '/2" <br /> 7.5 Gal. Cast Iron Base 19 '/2" <br /> 7.5 Gal. Composite Base 21 '/2" <br /> 2. Set multi-port manhole assembly (skirt, ring, and Note: Add an extra 3-1/4"when using an OPW <br /> cover)to the final grade position. (See Figure FSA-400 Face Seal Adaptor. (See Figure 2.) <br /> 2.) <br /> 5. Deburr and thoroughly clean riser pipe(s). <br /> Finish Grade 6. Apply pipe dope to riser(s). The pipe dope is to <br /> be a non-hardening, gasoline resistant, pipe <br /> thread seal compound. <br /> 7. Install OPW FSA-400 Face Seal Adapter onto <br /> riser. (Recommend Torque, 4" NPT, 125 ft-lbs <br /> min. to 250 ft-lbs max.). Apply pipe dope to <br /> FSA-400. The pipe dope is to be a non- <br /> hardening, gasoline resistant, pipe thread seal <br /> compound. This is optional for spill containers <br /> that are on the vapor lines. <br /> 8. Thread the spill containers on hand tight. <br /> Note: Do NOT attempt to completely tighten the <br /> Figure 2 containment bucket by using the containment <br /> bucket mounting ring at the top of the bucket. <br /> Note: It is strongly recommended that POMECO 9. Inspect the containment bucket gasket(s) and <br /> covers be installed with the following minimum the ring gasket for damage. Replace the <br /> clearances. Sheet metal skirts should have gasket(s) if they are damaged. <br /> adequate clearance between the tank sump riser 10. Apply an even bead of PISCES SL-1100 to the <br /> sidewall and or the sump top hat. A minimum of topside of the containment bucket gasket(s). <br /> one and a half inches clearance on all sides is (See Figure 4.) <br /> recommended between the POMECO skirt and <br /> the tank sump wall or the sump top hat wall. A , ISCES SL-1100 <br /> minimum of two inches clearance is �. <br /> recommended between the bottom of the / <br /> �, Ing <br /> POMECO skirt and the horizontal surface of the ��i' Gasket <br /> tank sump or sump top hat. These clearances <br /> are recommended to allow adequate water <br /> migration away from the sumps. Great care , <br /> should be used to maintain the recommended -- ontainment <br /> clearances when setting the rings and pouring Bucket <br /> the concrete. (See Figure 3.) Gasket <br /> Figure 4 <br /> 1%2 Min 11. Apply an even bead of PISCES SL-1100 to the <br /> topside of the ring gasket. (See Figure 4.) <br /> 12. Replace the multi-port cover, centering the <br /> riser(s) as close as possible in the containment <br /> openings. Be very careful not to move or <br /> damage the gaskets. <br /> Figure 3 <br /> POMECO Multi port Spill Container Page 2 <br />