Laserfiche WebLink
13. Using the 61 SA-TOOL, tighten the spill 19. Apply an even bead of PISCES SL-1100 around <br /> container(s) onto the riser(s)with a minimum the 5/16" hex bolts after final tightening. <br /> torque of 125 ft.-Ibs. and a maximum torque of 20. Install the spill bucket covers. (See Figure 6.) <br /> 250 ft.-lbs. <br /> 14. The bolt holes in the multi-port cover must line 21. (Optional): Install the product identification disc <br /> up with the bolt holes in the containment bucket on the spill bucket cover and multi-port cover in <br /> mounting ring. the I.D. disc recess. <br /> 15. Maintenance or as needed: Apply an even bead 22. Cover the multi-port perimeter ring and cover <br /> of PISCES SL-1100 onto the bottom of the with plastic to prevent concrete from settling in <br /> mounting ring before assembling the the drainage areas. <br /> containment bucket mounting ring and the 23. It is required that the perimeter ring and skirt <br /> mounting ring onto the multi-port cover. (See assembly, and the multi-port cover be set as an <br /> Figure 5.) assembled unit, with the bolts engaged. Failure <br /> to engage the bolts may result in the distortion of <br /> Bolt Beveled Washer the ring and improper fit of the ring to cover after <br /> evel Facing Down) the concrete is poured. <br /> Mounting Ring i' Z"_>Thread Seal Washer 24. When pouring the concrete, hand shovel or <br /> trowel the concrete around the multi-port <br /> 1SCES SL-1100 assembly to prevent the unit from moving or <br /> shifting, which can cause alignment problems <br /> i` and future maintenance problems. <br /> T �..!' 'ontainment Bucket Note: Do not stand on the multi-port before the <br /> Y' Mounting Ring concrete has set up. <br /> 25. It is recommended that the paved contours <br /> around POMECO covers be adequately sloped <br /> Figure 5 to direct water flow away from the cover, and <br /> directing water runoff from adjacent areas away <br /> from POMECO covers. (See Figure 7.) <br /> 16. Install the beveled thread seal flat washer and <br /> the thread seal washer onto the bolts for the <br /> mounting ring. (See Figure 5.) <br /> Note: Install the beveled thread seal flat washer + �y' .>> <br /> on the bolt with the beveled surface away from <br /> the bolt head. Install the thread seal washer to <br /> seat between the flat washer and the mounting <br /> ring. <br /> 17. Apply PISCES SL-1100 to each bolt prior to <br /> inserting them into the mounting ring. <br /> 18. Tighten the mounting ring retaining bolts until <br /> the containment bucket gasket makes contact <br /> with the multi-port cover. Then, in a crossing Figure 7 <br /> pattern, torque the bolts down between 15 to 20 <br /> ft.-Ibs. <br /> 26. Remove the plastic after the concrete has set <br /> up. <br /> 27. After installation is complete, water test the <br /> O O multi-port fixture. The recommended water test <br /> procedures include: <br /> a) Spraying water on cover(s)for 5 to 10 <br /> minutes, using a commonly available <br /> 0 0 watering device such as a lawn sprinkler. <br /> b) Standing water test, not to exceed 1/2" in <br /> water depth for a period of 5 to 10 minutes. <br /> Note: The containment bucket consists of three <br /> components steel top ring, bellows, and bucket <br /> bottom. These parts are held together with stainless <br /> steel retaining bands. <br /> Figure 6 <br /> POMECO Multi port Spill Container Page 3 <br />