Laserfiche WebLink
DO NOT loosen the stainless steel retaining bands <br /> securing the bellows to the containment bucket top Testing Spill Containers <br /> ring or the containment bucket bottom. Loosening Use California Test Procedures. Their Test <br /> the retaining bands voids any and all warranties on Procedures will check the seals between the drain <br /> this product. valve, nipple and rotatable adapter. To test the spill <br /> containers base and bellows fill the container with <br /> Warning: water. A drop in the water level of 1/16" or greater <br /> if the cover is removed, for any reason, follow after one hour means that a leak exists. To <br /> the Service and Maintenance instruction as determine where the leak is, look for a steady <br /> noted. Always remove the existinq-gaskets and stream of bubbles coming from one of the joints or <br /> install new gaskets. Never reuse the old water leaking on the outside of the bucket. NOTE: <br /> _gaskets. Reuse of gaskets may result in an Do not drain the water into the UST after the test is <br /> improper seal. complete. Water must be disposed of per local <br /> requirements for hazardous waste. If the leak <br /> Operation and Maintenance: cannot be corrected the spill container should be <br /> After each fuel delivery, the operator must replaced with another. <br /> remove any standing fuel from the container. <br /> Fuel can be removed by actuating the drain POMECO recommends periodic inspection of covers <br /> valve or with a gasoline absorbing disposable and seals as a part of the regularly scheduled <br /> towel. Annually: Inspect and clean the interior maintenance program. If any of the seals are <br /> of the spill container and drain valve screen. damage they should be replace. Only qualified, <br /> Remove accumulated dirt and grit. If the drain competent, well-trained technicians should perform <br /> g maintenance. <br /> valve screen becomes clogged, remove the Note: Common sense and good judgment should <br /> valve, soak in water and use high-pressure air to always be exercised. The contractor's <br /> clean. Reinstall the drain valve to its proper position understanding of all related site conditions prior to <br /> and test the valve per the appropriate California Test starting the project is essential. If the contractor <br /> Procedure. If problems persist, replace the drain does not have a clear understanding of the required <br /> valve with P/N 1 DK-2100-EVR (specified torque work and site conditions, the contractor is advised to <br /> 11.5 ft-lbs min to 13.5 ft-lbs max, 5/16-18 UN seek clarification prior to starting any portion of the <br /> thread). The sealable cover (1 SC) adjustment project. <br /> nut is set at the factory, but due to <br /> environmental conditions it may be necessary <br /> to adjust it to either improve sealing or ease <br /> cover removal. <br /> Important: Leave these instructions with Station <br /> Operator as per CARB Requirements <br /> R E ,2FIV D <br /> UCT 1 1 2018 <br /> C30 F3, - ENVIRONMENTAL HEALTH <br /> A P DOVER cOMPAMv DEPARTMENT <br /> P.O. Box 405003* Cincinnati, Ohio 45240-5003 <br /> 1-800-422-2525 Domestically <br /> 513-870-3315 Internationally <br /> Marketing Agent for POMECO by OPW, Inc. <br /> Copyright, 2002 -OPW Fueling Components Inc., Cincinnati, OH <br /> Printed in U.S.A. p/n H14976PA—09/02 <br /> POMECO Multi port Spill Container Page 4 <br />