My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 2:06:02 PM
Creation date
7/22/2020 1:59:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• •sAN3JoAQuiN Environmental Health Department <br /> COUNTY----- -- <br /> .. <br /> Undergraundtorage=Tank Program tnspecf�on Report <br /> ., _. <br /> Facility Name: Facility Address: Date: <br /> ONE STOP MARKET* 1151 W LOUISE AVE, MANTECA December 06,2018 <br /> Item# Remarks <br /> 105 CCR 2632(d)(1), 2634(d) Failed to have an approved UST monitoring plan. <br /> The monitoring plan is not current and/or not approved by the EHD. On all three tanks, FE Petro STP-MLD was <br /> listed as the mechanical line leak detector, however while inspector was on site, VMI 99LD2000 mechanical line <br /> leak detectors were observed furthermore under record keeping it listed"tank integrity testing test results to be kept <br /> on site" however the site manager stated that they did not keep tank integrity test results. In all monitoring tanks <br /> under record keeping it stated that"equipment maintenance and calibration records were not kept on site however it <br /> is require under title 23, chapter 16 to have those records on site and it should state yes. Lastly the 91 product tank <br /> monitoring plan listed annular sensor to be 409 however sensor 407 was noted at the time of inspection.The <br /> monitoring plan was corrected and uploaded to the California Environmental Reporting System (CERS)to correct <br /> this violation while the inspector was on site. <br /> This was corrected on site. <br /> This is a repeat violation, Class II. <br /> 204 CCR 2712(1) Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times.The manager was able to make the corrections to the monitoring plan while the <br /> inspector was on site. <br /> This was corrected on site. <br /> This is a minor violation. <br /> FA0000819 PR0231429 SCO01 12/06/2018 <br /> EHD 23-01 Rev.09/28/2018 Page 4 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.