My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011980
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
ARCHIVED REPORTS_XR0011980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:57:45 PM
Creation date
7/22/2020 2:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011980
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> The enclosed drawings and specifications contain information for the construction and <br /> installation of a C-Sparge system. The scope of work requires contractor to connect <br /> five existing C-Sparge wells (IW-1 through IW-5) to a C-Sparge panel using 3!$ inches <br /> (outer diameter) Teflon tubing. The Teflon tubing between each C-Sparge well and <br /> panel is to be double contained in 9/ inch schedule 40 PVC pipe A complete drawing <br /> package includes the following drawing sheets. <br /> Drawing No. Revision Title <br /> C-0 1 General -Specifications <br /> C-'l 1 Site Layout <br /> C-2 1 Trenching Details &Well Head Details <br /> C-3 1 C-Sparge Panel Details <br /> Appendix A Material Safety Data Sheet for ozone <br /> 2.0 SAFETY <br /> 1. Contractor will be solely responsible for initiating, maintaining, and supervising all <br /> safety precautions, in compliance with OSHA, Federal, State and Local regulations. All <br /> injuries related to the construction project and damaged to equipment or facilities must <br /> be reported to the Project Manager or Project Engineer the day of the incident (within 8- <br /> hours). <br /> 2. Contractor is responsible for preparing and enforcing a Site Safety Plan (SSP) <br /> suitable for activities conducted under this scope of work. <br /> 3. To assist in evaluating health effects of ozone, material safety data sheet (MSDS)for <br /> ozone is presented in Appendix A. <br /> 3.0 SPECIFICAT90M <br /> 3.1 General <br /> 1. The selected contractor is required to conduct a pre-construction meeting with the <br /> consultant before construction begins. <br /> 2. The selected contractor shall verify all dimensions and all conditions before starting <br /> work. The consultant's Project Manager or Project Engineer shall be notified of any site <br /> discrepancies. <br /> 3. All material used for the construction of this system shall be new unless otherwise <br /> noted and in working order. <br /> 4. All necessary construction permits and inspections shall be obtained and paid for by <br /> the contractor. These permits may include the follovving permits: building, electrical, <br /> mechanical, and civil construction (not limited to). <br />
The URL can be used to link to this page
Your browser does not support the video tag.