My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011980
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
ARCHIVED REPORTS_XR0011980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:57:45 PM
Creation date
7/22/2020 2:29:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011980
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 Piping <br /> 1. Contractor to run each c-sparge well (IW-1 through IW-5) with 318-inches (outer <br /> diameter) secondary contained tubing within a 314-inch sch. 40 PVC pipe with sweeps. <br /> 2. All process piping shall be pressured tested with ozone at 5-psi and must hold the <br /> pressure for 30 minutes, Contractor to monitor for ozone leakages during pressure <br /> testing at the control panel and at the well-head using a portable ozone monitoring <br /> device. A representative of the consultant must be observed the pressure test. <br /> 3.4 Electrical <br /> 1. Contractor to run necessary electrical conduits and wires from the service <br /> main/disconnect located inside the Arco Service Station to 20 amp GFI, <br /> 2, Contractor shall furnish all necessary equipment and labor to provide adequate <br /> electrical supply to operate the C-Sparge panel. <br /> 3. Contractor shall verify the operation of all electrical equipment upon completion <br /> of the work. <br /> 3.5 Signage <br /> 1. Contractor to install the following signage on two sides of the equipment enclosure: <br /> o Danger Highly Reactive <br /> o Danger Flammable Gays <br /> o No Smoking <br /> a Others per local code <br /> 3.6 Construction Schedule <br /> 1. The contractor will confirm the construction schedule with the consultant's Project <br /> Manager or Project Engineer at least 72-hours prior to any work on site. <br /> 2. A facsimile communication of project progress shall be forward to consultant every <br /> third day of construction for the duration of the construction project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.