My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
3500 - Local Oversight Program
>
PR0545892
>
ARCHIVED REPORTS_XR0011988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:49:50 PM
Creation date
7/22/2020 2:33:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011988
RECORD_ID
PR0545892
PE
3528
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
02
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Date August 23, 2001 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No: 5469 Address: 130 South Wilson Way, Stockton, California <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person: Delta Environmental Consultants, Inc. /Jay R. Johnson _ <br /> Consultant Project No: D000-336 <br /> Primary Agency/Regulatory 1D No: Margaret La orio, San Joa uin County Public Health Services <br /> WORK PERFORMED THIS QUARTER(Second 2001): <br /> 1. Groundwater samples were collected from monitoring wells MW-1 through MW-10 and submitted for <br /> laboratory analysis. <br /> 2. Delta compiled and evaluated groundwater monitoring data. <br /> 3. Delta implemented work activities outlined in the March 19, 2001 work plan. Delta retained <br /> Woodward Drilling Company to drill and install monitoring wells MW-7 through MW-10 on May 30 and <br /> 31',2001. <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2001): <br /> • 1. Delta will continue to perform routine quarterly groundwater monitoring on behalf of ARCO. The next <br /> sampling event is tentatively scheduled for September 2001. <br /> 2. Delta will submit a well installation report presenting the results of activities associated with installing <br /> monitoring wells MW-7 through MW-10. <br /> 3. Groundwater samples will be collected from monitoring wells MW-1 through MW-11 0 and analyzed for <br /> total petroleum hydrocarbons as gasoline (TPHG), benzene, toluene, ethylbenzene, and total xylenes <br /> (BTEX) using USEPA Method 8015/8020 DWS LUFT and for tertiary butyl alcohol (TBA), methyl <br /> tertiary butyl ether (MTBE), di-isopropyl ether (DIPS), ethyl tertiary butyl ether (ETBE), tertiary amyl <br /> methyl ether (TAME), 1,2-Dichloroethane (1,2-DCA), and ethylene dibromide (EDB) using USEPA <br /> Method 8260. <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: All Monitoring Wells= Quarter) <br /> Frequency of Groundwater Monitoring: _Quarterly- <br /> Sampling Date: May 24,2001 (Wells MW-1 through MW-6) <br /> June 28,2001 Wells MW-7 through MW-10 <br /> Is Free Product(FP) Present on Site: No <br /> FP Recovered This Quarter: NIA <br /> Cumulative FP Recovered to Date: NIA <br /> Approximate Depth to Groundwater: 36.83 to 38.20 feet bgs <br /> Groundwater Flow Direction: East-Northeast <br /> Groundwater Gradient: 0.0022 ft/ft <br /> C:\ARCO\54691Quarterly12001\5469-2Q01Report.doc Delta <br /> 8/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.