My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:53:30 PM
Creation date
7/22/2020 2:50:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
Colonial Energy CE 40135 (DBA Power Mart)
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-ENNIAL SECONDARY CONTAINMENT TEST <br /> TEST DATE: September 12, 2018 <br /> 1. OWNER <br /> Name Colonial Energy, LLC. <br /> Address 2860 N. Santiago Blvd. 2nd Floor, Orange, CA 92867 Phone# 714-761-5426 <br /> Contact Victor Hassan <br /> 2. FACILITY <br /> Name Colonial Energy#40135 <br /> Address 192 Lathrop Road, Lathrop, CA 95330 Phone# 209-858-4998 <br /> Contact Station Manager <br /> 3. CUPA <br /> Name San Joaquin County Environmental Health Notified September 07, 2018 <br /> Address 1868 E. Hazelton Avenue, Stockton, CA 95202 Phone# 209-468-3442 <br /> Contact UST Team Fax# 209-468-3433 <br /> Inspector Present NONE <br /> 4. TESTING CONTRACTOR <br /> Name Walton Engineering, Inc. Lic# 617238 A, B, Haz <br /> Address P.O. Box 1025,West Sacramento, CA 95691 Phone# 916-373-1166 <br /> Contact Veronica Freitas Fax# 916-373-1173 <br /> Test Technician David Delgado <br /> 5. SUMMARY OF TEST RESULTS <br /> Tank Annulars Tested 4 Containment Sumps Tested 4 <br /> Secondary Lines Tested 4 UDC's Tested 12 <br /> Component Results Component Results <br /> Annular-Tank#1 Gasoline-87 East Pass U D C#1 Disp#1/2 Pass <br /> Annular-Tank#2 Gasoline-87 West Pass U D C#2 Disp#3/4 Pass <br /> Annular-Tank#3 Gasoline-91 Pass U D C#3 Disp#5/6 Pass <br /> Annular-Tank#4 Diesel Pass U D C#4 Disp#7/8 Pass <br /> U D C#5 Disp#9/10 Pass <br /> Secondary Line#1 Gasoline-87 East Pass U D C#6 Disp#11/12 Pass <br /> Secondary Line#2 Gasoline-87 West Pass U D C#7 Disp#13/14 Pass <br /> Secondary Line#3 Gasoline-91 Pass U D C#8 Disp#15/16 Pass <br /> Secondary Line#4 Diesel Pass U D C#9 Disp#17/18 Pass <br /> U D C#10 Disp#19/20 Pass <br /> U D C#11 Disp#21/22 Pass <br /> Piping Sump#1 Gasoline-87 East Pass U D C#12 Disp#23/24 Pass <br /> Piping Sump#2 Gasoline-87 West Pass <br /> Piping Sump#3 Gasoline-91 Pass <br /> Piping Sump#4 Diesel Pass <br /> 6. COMMENTS <br /> Technician signature Qdc< (�`-ltt,r�' Date 9/12/208 <br /> © 2016 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.