My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:53:30 PM
Creation date
7/22/2020 2:50:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
Colonial Energy CE 40135 (DBA Power Mart)
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK ANNULAR TESTING <br /> Test Method By: • Manufacturer Industry Standard Professional Engr. Other(see below) <br /> Test Method Uses: Pressure 0 Vacuum Hydrostatic Other(see below) <br /> Measuring Equipment Used: Vacuum Gauge (range 0 to 30 inches Hg) <br /> Description Tank#1 Tank#2 Tank#3 Tank#4 <br /> Product stored Gasoline-87 East Gasoline-87 West Gasoline-91 Diesel <br /> Tank manufacturer Modem Modern Modern Modern <br /> Tank material Steel Steel Steel Steel <br /> Tank capacity (US gallons) 20,000 20,000 20,000 12,000 <br /> Is this a multi-compartment tank? No No No No <br /> Dry or Brine filled annular? Dry Dry Dry Dry <br /> Monitoring system show normal annular? Yes Yes Yes Yes <br /> Is water table above tank bottom? Unknown Unknown Unknown Unknown <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes Yes <br /> Wait time for vacuum to stabilize (hr:min) :15 :15 15 :15 <br /> Test start time 12:40 PM 12:45 PM 10:30 AM 10:35 AM <br /> Initial vacuum (inches Hg) 7.0 7.0 7.0 7.0 <br /> Test end time 2:40 PM 2:45 PM 12:30 PM 11:35 AM <br /> Final vacuum (inches Hg) 7.0 7.0 7.0 7.0 <br /> Test duration (hr:min) 2:00 2:00 2:00 1:00 <br /> Change in vacuum (inches Hg) 0.0 0.0 0.0 0.0 <br /> Pass/Fail threshold (inches Hg/hour) 2.2 2.0 2.0 2.0 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> 0 2016 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.