My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 2:53:30 PM
Creation date
7/22/2020 2:50:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
FACILITY_NAME
Colonial Energy CE 40135 (DBA Power Mart)
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: Manufacturer • Industry standard . Professional Engr Other(see below) <br /> Test Method Uses: • Pressure vacuum Hydrostatic Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 Line#3 Line#4 <br /> Tank product Gasoline-87 East Gasoline-87 West Gasoline-91 Diesel <br /> Pipe manufacturer Smith Smith Smith Smith <br /> Pipe material FRP FRP FRP FRP <br /> Primary pipe diameter (inches) 2" 2" 2" 2" <br /> Secondary pipe diameter (inches) 3" 3" 3" 3" <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump/UDC Sump/UDC Sump/UDC Sump/UDC <br /> Estimated length of piping run (feet) _ 280' 280' 200' 100' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) :10 :10 :10 :10 <br /> Test start time 10:05 AM 10:05 AM 10:10 AM 11:45 AM <br /> Initial pressure (psig) 5.0 5.0 5.0 5.0 <br /> Test end time 11:05 AM 11:05 AM 11:10 AM 12:45 PM <br /> Final pressure(psig) 5.0 5.0 5.0 5.0 <br /> Test duration (hr:min) 1:00 1:00 1:00 1:00 <br /> Change in pressure (psig) 0.0 0.0 0.0 0.0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> Lines#1 and#2 are joined underground at the end of each of the 4 islands and the joined <br /> ©2016 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.