My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:41:12 PM
Creation date
7/22/2020 3:22:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John & Maxine Ferraiolo -2- December 9, 2000 <br /> Claim No. 15094 <br /> ❑ A complete and signed copy of the proposed investigative work plan, corrective action <br /> plan, or other work plan, including copies of all work plan addenda. <br /> E3 A signed copy of the appropriate lead regulatory oversight agency approval letter for <br /> the proposed plan and all addenda. <br /> 0 A complete copy of the Request for Bids (RFB) and a list of all firms invited to bid. It is <br /> strongly recommended that the RFB include a"fill-in-the-blanks" Bid Form identifying all <br /> mayor tasks of the proposed work along w th ff e following minim Cum ost bre-lc`o`own items~ <br /> - <br /> ♦ List of all staff/worker classifications and hourly rates of each to be utilized. <br /> ♦ The number of hours'to be utilized by each staff/worker <br /> ♦ Subcontractor costs <br /> ♦ Equipment costs <br /> ♦ Itemized listing of estimated ancillary/incidental costs <br /> ❑ Cost proposal including a breakdown,with task subtotals and a grand total cost for the <br /> entire scope of work. <br /> If you need assistance in procuring contractor and consultant services or if you have any <br /> questions, don't hesitate to call me. I can be reached at (916) 22774518. <br /> Sincerely,. <br /> Wennilyn Fua, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County PHS-EHD <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> b <br /> CaMbroia Eo vironmeaWProteedeB AgeBey <br /> .n <br /> P.t1 RecycledPgper <br />
The URL can be used to link to this page
Your browser does not support the video tag.