My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2662
>
3500 - Local Oversight Program
>
PR0545898
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 3:38:19 PM
Creation date
7/22/2020 3:32:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545898
PE
3528
FACILITY_ID
FA0005555
FACILITY_NAME
MALIK ALL TIRES WHEEL
STREET_NUMBER
2662
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11706033
CURRENT_STATUS
02
SITE_LOCATION
2662 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA worksites. Level D includes: <br /> Steel toed boots <br /> _ Safety Glasses <br /> Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task. <br /> . :... .:... :::. .. .:: . . <br /> .... <br /> �ii <br /> Task'ts).>. `'::;`:<;.. :`::.. '`;;:.Oondt#a n... -Rersonn l.:.. "<`;'..,:`.;:'.'.'.": a er I s:.::.>:.:.:'.::>.;:...;;, <br /> 1 Working Near Vehicle Orange Vests or equivelent <br /> 1 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> I <br /> Site will be secured as follows:Site is fenced <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> MARK WORK ZONES and EVACUATION ROUTE(S) ON SITE MAP p CHECK WHEN DONE. <br /> On-site communications: ❑ Radio El Verbal ❑ Hand Signals j <br /> ❑ Other <br /> Designate hand signals here: j <br /> Off-site communications: ❑ Radio ❑x Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.