Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment (i.e., <br /> gloves,coveralls) will be placed on and covered with <br /> 6-mil plastic sheeting along with the drill cuttings. <br /> Location of Wash Water: Site Buildinq <br /> Location of Toilet: Site Building <br /> Location of Drinking Water: Site Building <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> EMERGENCY RESPONSE <br /> In case of an emergency the branch safety officer must be notified by the site safety officer or <br /> project manager. The site safety officer or her/his alternate will notify outside emergency response <br /> agencies (ER) as needed, the branch safety officer, and the project supervisor/manager. The branch <br /> safety officer will make any required reports to local, state, and federal agencies. Other emergency <br /> notifications will include: <br /> ER Agency: Fire/Police Depts. Phone: 911 <br /> ER Agency: Ambulance Phone: 911 <br /> Site Safety Officer: Sean Garvey Mobil Phone: 209/401-3481 <br /> Pager No. 209/567-8402 <br /> Site Safety Alternate: Greg Stahl Office Phone: 209/838-9888 <br /> Pager No. <br /> Corporate Safety Manager: John Lane Office Phone: 209/838-9888 <br /> Project Manager: Greg Stahl Office Phone: 209/838-9888 <br /> Pager No. <br /> PAGE 9 <br />