My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 3:18:10 PM
Creation date
7/22/2020 4:14:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: ❑ Pressure X Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution : - '/2" x -30" Hg. <br /> Tank # 1 &3 Tank # 2 &4 Tank # Tank # <br /> Is Tank Exempt From Testing? ' No No <br /> Tank Capacity: 16K Split 10/6 15K Split 8/7 <br /> Tank Material : Fiberglass Fiberglass <br /> Tank Manufacturer: Owens Corning Owens Corning <br /> Product Stored : Regular 87/Super 91 Race 100/Diesel <br /> Wait time between applying 10 Minutes 10 Minutes <br /> vacuum and starting test: <br /> Test Start Time : 8 :40 8 : 30 <br /> Initial Reading (Ri) : - 10" Hg. - 10" Hg. <br /> Test End Time : 9 :40 9 : 30 <br /> Final Reading (RF) : - 10" Hg. - 10" Hg. <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0" Hg. 0" Hg. <br /> Pass/Fail Threshold or Criteria : ➢ -2" Hg. ➢ -2" Hg. <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? No No <br /> Was sensor properly replaced and N/A N/A <br /> verified functional after testing? <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> testing. { California Code of Regulations, Title 23 , Section 2637(a)(6) } <br />
The URL can be used to link to this page
Your browser does not support the video tag.