My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 3:18:10 PM
Creation date
7/22/2020 4:14:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page of <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1 / 10 x 15 Psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material : Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3 " 3 " <br /> Length of Piping Run : Approx . 130 ' Approx. 100 ' Approx. 120 ' Approx. 125 ' <br /> Product Stored: Regular 87 Race 100 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump # 1 Piping Sump #2 Piping Sump #3 Piping Sump #4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time : 8 : 55 8 : 45 9 : 25 8 : 35 <br /> Initial Reading (RI) : 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time : 9 : 55 9 : 45 10 :25 9 : 35 <br /> Final Reading (RF) : 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 0 0 0 <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump, prior to Testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.