My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
230
>
2300 - Underground Storage Tank Program
>
PR0231330
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 8:55:32 AM
Creation date
7/23/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231330
PE
2361
FACILITY_ID
FA0003964
FACILITY_NAME
LODI PUBLIC SAFETY BUILDING
STREET_NUMBER
230
Direction
W
STREET_NAME
ELM
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303109
CURRENT_STATUS
02
SITE_LOCATION
230 W ELM ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br /> G E i J E R A L P R O V I S I ON S <br /> 5.100 SCOPE OF WORK enforce and make effective such decisions and orders <br /> as the Contractor fails to carry out promptly. <br /> 5.101 Work to be Done The work to be done <br /> consists of urnishiny a labor, materials, methods 5.202 Plans All authorized alterations affecting <br /> and processes, implements, tools and machinery, the requirements and information given on the <br /> except as otherwise specified, which are necessary approved plans shall be in writing. No changes <br /> and required to construct and complete the work shall be made of any plan or drawing after the same <br /> designated in these specifications and improvement has been approved by the City Engineer, except by <br /> plans, and to leave the grounds in a neat condition, direction of the City Engineer. <br /> 5.102 Alterations By mutual consent in writing The contract plans shall be supplemented by such <br /> of the parties signatory to the contract, working drawings prepared by the Contractor as are <br /> alterations or deviations, increases or decreases, necessary to adequately control the work. These <br /> and additions. or omissions in the plans and plans shall be approved by the City Engineer before <br /> specifications may be made and the same shall in no any work involving these plans shall be performed. <br /> way affect or make void the contract. No change shall be made by the Contractor in any <br /> working drawing after it has been approved by the <br /> The City of Lodi reserves the right to increase or Engineer. <br /> decrease the quantity of any item or portion of the <br /> work, or to omit portions of the work as may be Full compensation for furnishing all working <br /> deemed necessary or expedient by the City Engineer. drawings shall be considered as included in the <br /> prices paid for the contract items of work to -which <br /> 5.103 Extra Work New and unforeseen work will be such drawings relate and no additional compensation <br /> c assed as extra work when such work cannot be will be allowed therefor. <br /> covered by any of the various items for which there <br /> is a contract bid price. It is mutually agreed, however, that approval by the <br /> City Engineer of the Contractor's working plans does <br /> The Contractor shall do no extra work except upon a not relieve the Contractor of any responsibility for <br /> written change order from the City Engineer. For accuracy of dimensions and details, and that the <br /> such extra work the Contractor shall receive payment Contractor shall be responsible for agreement and <br /> as previously agreed upon in the change order or as conformity of Contractor's working plans with the <br /> provided in Section 5.604, "Extra Work", of these approved plans and specifications. <br /> General Provisions. <br /> 5.203 Conformitwith Contract Documents and <br /> 5.104 Cleaninj_UR The Contractor shall not allow A7 I owa at <br /> a Deviions Work and materia s s a <br /> -17 <br /> the Tle— of he work to become littered with trash conform to t e Ines, grades, cross sections, <br /> and waste material, but shall maintain the same in a dimensions and material requirements, including <br /> neat and ' orderly condition throughout the tolerances, shown on the plans or indicated in the <br /> construction period. The Engineer shall have the specifications. <br /> ria_ht to determine what is or is not waste material <br /> or rubbish and the place and manner of disposal. Deviations from the approved plans, as may be <br /> required by the urgencies of construction, will be <br /> The Contractor shall remove and dispose of all trees determined in all cases by the City Engineer and <br /> designated by the City Engineer as obstructions to authorized in writing. <br /> the proper completion of the work. <br /> 5.204 Coordination of Plans and 5 efications <br /> Upon completion and before making application for The plans an specification Ici <br /> nc u Ing all <br /> final acceptance of the work, the Contractor shall supplementary documents are essential parts of the <br /> clean the street or road, borrow pits, and all contract and a requirement occurring in one is as <br /> ground occupied by Contractor in connection with the binding as though occurring in all. They are <br /> work of all rubbish, excess materials, temporary intended to be cooperative, to describe, and to <br /> structures, and equipment; and all parts of the work provide for a complete work. <br /> shall be left in a neat and presentable condition, <br /> acceptable to the Engineer. Plans shall govern over Special Provisions. Special <br /> Provisions shall govern over General Provisions. <br /> 5.200 CONTROL OF WORK General Provisions shall govern over Standard <br /> Specifications and Standard plans. <br /> 5.201 Authority of the City Eng'neer The City <br /> Engineer s a decide any and alt questions which 5.205 Interpretation of Plans and Specifications <br /> may arise as to the quality or acceptability of Should It appear that the work to be done, or any <br /> materials furnished and work performed, and as to matter relative thereto, is not sufficiently <br /> the manner of performance and rate of progress of detailed or explained in the plans and <br /> the work; all questions which arise as to the specifications, the Contractor shall apply to the <br /> interpretation of the plans and specifications; all City Engineer for such further explanations as may <br /> questions as to the acceptable fulfillment of the be necessary, and shall conform to such explanation <br /> contract on the part of the Contractor; and all or interpretation as part of the contract so far as <br /> questions as to claims and compensation. may be consistent with the intent of the original <br /> specifications. In the event of doubt or question <br /> The City Engineer's decision shall be final. The relative to the true. meaning of the contract <br /> City Engineer shall have executive authority to documents, reference shall be made to the City <br /> Engineer, whose decision thereon shall be final.. <br /> 5. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.