My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
230
>
2300 - Underground Storage Tank Program
>
PR0231330
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 8:55:32 AM
Creation date
7/23/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231330
PE
2361
FACILITY_ID
FA0003964
FACILITY_NAME
LODI PUBLIC SAFETY BUILDING
STREET_NUMBER
230
Direction
W
STREET_NAME
ELM
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303109
CURRENT_STATUS
02
SITE_LOCATION
230 W ELM ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the event of any discrepancy between any drawing damaged, they will be replaced at the Engineer's <br /> and the figures written thereon, the figures shall earliest convenience. The Contractor will be <br /> be taken as correct. charged for the cost of necessary replacement or <br /> restoration of stakes and points which, in the <br /> 5.206 Order of Work When required by the Special judgment of the Engineer, were carelessly or <br /> Provisions or plans, the Contractor shall follow the willfully destroyed or damaged by the Contractor's <br /> sequence of operations as set forth therein, operations. This charge will be deducted from any <br /> Full compensation for conforming with such moneys due or to become due the Contractor. <br /> requirements will be considered as included in the 5.210 Inspection The Engineer shall at all times <br /> prices paid for the various contract items of work, have access to the work during its construction, and <br /> and no additional compensation will be allowed shall be furnished with every reasonable facility <br /> therefor. for ascertaining that the materials and the <br /> 5.207 Plans and Specifications on Job Site A workmanship are in accordance with the requirements <br /> complete, approved set of plans, specifications and and intentions of the specifications, the General <br /> change orders shall be kept on the job site and Provisions, and the plans. All work done and all <br /> available at all times. Non-availability shall be materials furnished shall be subject to the <br /> deemed a cause for temporary suspension of work. Engineer's inspection. <br /> 5.208 Superintendence Before starting work, the The Contractor shall provide excavations for the <br /> Contractor shall designate in writing an authorized Engineer for the purpose of taking compaction tests <br /> representative who shall have the authority to in areas below existing grade where embankments or <br /> represent and act for the Contractor. trench and structure backfill has not been tested. <br /> Said authorized representative shall be present at Whenever the Contractor varies the period during <br /> the site of the work at all times while work is which work is carried on each day, due notice shall <br /> actually in progress on the contract. When work is be given to the City Engineer so that proper <br /> not in progress and during periods when work is inspection may be provided. <br /> suspended, arrangements acceptable to the Engineer The inspection of the work or materials shall not <br /> shall be made for any emergency work which may be relieve the Contractor of any obligations to fulfill <br /> required. the contract as prescribed. Work and materials not <br /> Whenever the Contractor or Contractor's authorized meeting such requirements shall be made good, and <br /> representative is not present on any particular part unsuitable work or materials may be rejected, <br /> of the work where it may be desired to give notwithstanding that such work or materials have <br /> direction, orders will be given by the Engineer, been previously inspected by the Engineer or that <br /> which shall be received and obeyed by the payment therefor has been included in a progress <br /> superintendent or supervisor who may have charge of estimate. <br /> the particular work in reference to which the orders The projects financed in whole or in part with State <br /> are given, funds shall be subject to inspection at all times by <br /> Any order given by the Engineer, not otherwise the designated agents of the State of California. <br /> required by the specifications to be in writing, Portions of the work done under a San Joaquin County <br /> will, on request of the Contractor, be given or encroachment permit shall be subject to County <br /> confirmed in writing. inspection. <br /> 5.209 Lines and Grades All distances and 5.211 Removal of Defective and Unauthorized Work <br /> measurements are given and will be made in a All work which is defective in its construction or <br /> horizontal plane. Grades are given from the top of deficient in any of the requirements of these <br /> stakes or nails, unless otherwise noted. Such specifications shall be remedied, or removed and <br /> stakes or points will be set as the Engineer replaced by the Contractor in an acceptable manner, <br /> determines to be necessary to establish the lines and no compensation will be allowed for such <br /> and grades required for the completion of the work correction. <br /> specified in the plans and specifications. <br /> All work done beyond the lines and grades shown on <br /> Three consecutive points shown on the same rate of the plans or established by the City Engineer, or <br /> slope must be used in common in order to detect any any extra work done without written authority, will <br /> variation from a straight grade; and in case any be considered as unauthorized and will not be paid <br /> such discrepancy exists, it must be reported to the for. <br /> City Engineer. If such a discrepancy is not <br /> reported to the City Engineer, the Contractor shall Upon failure on the part of the Contractor to comply <br /> be responsible for any error in the finished work. forthwith with any order of the City Engineer made <br /> under the provisions of this section, the City <br /> The Contractor shall give at least 24 hours notice Engineer shall have authority to cause defective <br /> whrr thr service% of the City Cnrlinvvr are required work to he rrmvdird, or rrmoved and replaced, and <br /> for laying out any portion of the work. unauthorized work to be removed and to deduct the <br /> costs thereof from any moneys due or to become due <br /> Stakes and points set by the Engineer shall be to the Contractor. <br /> carefully preserved by the Contractor until <br /> authorized to remove them by the City Engineer. In <br /> case such stakes and points are destroyed or <br /> 5.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.