|
5.403 Permits and Licenses Except as otherwise 5.408 Pre;ervatiun of Property Due care shall be
<br /> provided, the Contractor shall procure all permits exercised to avoid injury to existing improvements
<br /> and licenses, pay all charges and fees, and give all or facilities, utility facilities, adjacent
<br /> notices necessary and incidental to the due and property, and trees, shrubs and other plants that
<br /> lawful prosecution of the work. are not to be removed.
<br /> 5.404 Contractor's LicensingLaws Attention is Trees, shrubs and other plants that are not to be
<br /> directed to the provisions o apter 9 of Division removed, and pole lines, fences, signs, markers and
<br /> 3 of the Business and Professions Code concerning monuments, buildings and structures, and any other
<br /> the licensing of contractors. above ground improvements or facilities and all
<br /> underground facilities shown on the plans or brought
<br /> All hidders and contractor, shall be licensed in to the Contractor's attention during the contract,
<br /> accordance with the laws of the State of California wiLhln or adjdLVIIL to Lhe highway, shall be
<br /> and any bidder or contractor not so licensed is protected from injury or damage; and if ordered by
<br /> subject to the penalties imposed by such laws. the Engineer, the Contractor shall provide and
<br /> install suitable safeguards, approved by the
<br /> 5.405 Patents The' Contractor shall assume all Engineer, to protect such objects from injury or
<br /> responsibilities arising from the use of patented damage. Such objects injured or damaged by reason
<br /> materials, equipment, devices or processes used on of the Contractor's operations shall be replaced or
<br /> or incorporated in the work. restored to a condition as good as when the
<br /> Contractor entered upon the work, or as good as
<br /> 5.406 Safety Provisions The Contractor shall required by the specifications accompanying the
<br /> conform to the rules and regulations pertaining to contract. The Engineer may make or cause to be made
<br /> safety established by the California Division of such temporary repairs as are necessary to restore
<br /> Industrial Safety. to service any damaged facility. The cost of such
<br /> repairs shall be borne by the Contractor and may be
<br /> 5.407 Public Convenience and Safety The deducted from any moneys due or to become due to the
<br /> Conti-actor shall so con uct t e operation as to Contractor under the contract.
<br /> cause the least possible obstruction and Full compensation for furnishing all labor,
<br /> inconvenience to public traffic. Unless other
<br /> rel:linj :Irrrl; aro -.Ii1nrlalnil in Ihr "11r, 1.11 tonlr, v�gnirmpnt and incidenfalc, and for
<br /> Provisions to be used ds detours, dll traffic shall dolny all I.hc wurk InVuIVrd lu plrutcLLijig ur
<br /> be permitted to pass through the work. repairing property as specified in this section,
<br /> shall be considered as included in the prices paid
<br /> Residents along the road or street shall be provided for the various contract items of work, and no
<br /> passage as far as practicable. Convenient access to additional compensation will be allowed therefor.
<br /> driveways, houses and buildings along the road or
<br /> street shall be maintained and temporary crossing 5.409 Res onsibilit for Damage The City of
<br /> shall be provided and maintained to good condition. Lodi, the City Council, all officers and employees
<br /> Not more than one cross or intersecting street or or agent shall not be answerable or accountable in
<br /> road shall be closed at any one time without the any manner for any loss or damage that may happen to
<br /> approval of the City Engineer. the work or any part thereof; or for any material or
<br /> equipment used in performing the work; or for injury
<br /> The Contractor shall furnish, erect and maintain or damage to any person or persons, either work
<br /> such fences, barriers, lights, signs and flag personnel or the public; for damage to adjoining
<br /> persons as are necessary to give adequate warning to property from any cause whatsoever during the
<br /> the public at all times that the road or street is progress of the work or any time before final
<br /> under construction and of any dangerous conditions acceptance.
<br /> to be encountered as a result thereof, and shall The Contractor shall indemnify and save harmless the
<br /> also erect and maintain such warning and directional City of Lodi, the City Council, all officers and
<br /> signs as may be furnished by the City. employees or agent from any suits, claims or actions
<br /> Signs, lights, flags and other warning and safety brought by any person or persons for or on account
<br /> devices shall conform to the requirements set forth of any injuries or damages sustained or arising in
<br /> in the current "Manual of Warning Signs, Lights and the construction of the work or in consequence
<br /> Devices for Use in Performance of Work upon thereof. The City Council may retain as much of the
<br /> Highways," issued by the State of California money due the Contractor as shall be considered
<br /> Department of Transportation. Copies of this manual necessary until disposition has been made of such
<br /> are on file with the Public Works Department. suits or claims for damages as aforesaid.
<br /> No material or equipment shall be stored where it 5.410 Contractor's Responsibility for Work
<br /> will interfere with the free and safe passage of xcept as provided above, until t e orma
<br /> public traffic, and at the end of each day's work acceptance of the work by the City Council, the
<br /> and at other times when construction operations are Contractor shall have the charge and care thereof
<br /> suspended for any reason, the Contractor shall and shall bear the risk of injury or damage to any
<br /> remove all equipment and other obstructions from part thereof by the action of the elements or from
<br /> that portion of the roadway open for use by public any other cause, whether arising from the execution
<br /> traffic. or from the nonexecution of the work.
<br /> Full compensation for doing the above-mentioned work The Contractor shall rebuild, repair, restore and
<br /> shall be included in the price paid for the various make good all injuries or damages to any portion of
<br /> contract items of work, and no additional the work occasioned by any of the above causes
<br /> compensation will be allowed therefor. before final acceptance and shall bear the expenses
<br /> 5.4
<br />
|