Laserfiche WebLink
5.212 Final Inspection Whenever the work 5.304 City-furnished Materials Materials <br /> provided and contemplated by the contract shall have furnished by the City will a avai a e at locations <br /> been satisfactorily completed and the final cleaning designated in the Special Provisions, or if not <br /> up performed, and the City Engineer notified in designated therein they will be delivered to the <br /> writing, the City Engineer will make the final project. They shall be hauled to the site of the <br /> inspection. work by the Contractor at his/her expense, including <br /> any necessary loading and unloading that may be <br /> 5.300 CONTROL OF MATERIALS involved. The cost of handling and placing <br /> City-furnished materials shall be considered as <br /> 5.301 Source of Supply and Quality of Materials included in the price paid for the contract items <br /> The Contractor shall furnish all materials required involving such City-furnished materials. <br /> to complete the work, except materials that are City-furnished materials lost or damaged from any <br /> designated in the specifications to be furnished by cause whatsoever shall be replaced by the <br /> the City. Contractor. The Contractor will be liable to the <br /> City for the cost of replacing City-furnished <br /> .Only materials conforming to the requirements of the materials and such costs may be deducted from any <br /> specifications shall be incorporated in the work. . moneys due or to become due the Contractor. <br /> The materials furnished and used. shall be new,' 5.305 Trade Names and Alternatives For <br /> except as may be provided elsewhere in these convenience in designation on the pans or in the <br /> specifications or the plans. The materials shall be specifications, certain articles or materials to be <br /> manufactured, handled and used in a manner to insure incorporated in the work may be designated under a <br /> completed work in accordance with the plans and trade name or the name of the manufacturer and the <br /> specifications. catalogue information. The use of an alternative <br /> article or materials which are of equal quality and. <br /> Mdnufacturer's warranties, guarantees, instruction of the required characteristics for the purpose <br /> sheets and parts lists, which are furnished with intended will be permitted,,subject to the following <br /> certain articles or materials incorporated in the requirements. <br /> work, shall be delivered to the Engineer. before <br /> commencement of the work. The burden of proof as to the quality and <br /> suitability of alternatives shall be upon the <br /> 5.302 Samples and Tests At the option of the City Contractor, who shall furnish all information <br /> ngineer, the source of supply of each of the necessary as required by the Engineer. The Engineer <br /> materials shall be approved by the City Engineer shall be the sole judge as to the quality and <br /> before delivery is started and before such material suitability of alternative articles or materials and <br /> is used in the work. Representative preliminary such decision shall be final. <br /> samples of the character and quality prescribed <br /> 'shall be submitted by the Contractor or producer of Whenever the specifications permit the substitution <br /> all materials to be used in the work for testing or of a similar or equivalent material or article, no <br /> examination as desired by the City Engineer. tests or action relating to the approval of such <br /> substitute material will be made until the request <br /> All tests of materials furnished by the Contractor for substitution is made in writing by the <br /> shall be made in accordance with commonly recognized Contractor accompanied by complete data as to the <br /> standards of national organizations, and such equality of the material or article proposed. Such <br /> special methods and tests as are prescribed in these request shall be made in ample time to permit <br /> specifications. approva_1 without delaying the work._ <br /> The Contractor shall furnish such samples of 5.400 LEGAL RELATIONS AND RESPONSIBILITIES <br /> materials as are requested by the City Engineer, <br /> without charge. No material shall be used until it 5.401 Laws to be Observed The Contractor shall <br /> has been approved by the City Engineer. Samples keep him/herself u y informed of all existing and <br /> will be secured and tested whenever necessary to future State and National laws and all municipal <br /> determine the quality of material. ordinances and regulations of the City of Lodi which <br /> in any manner affect those engaged or employed in <br /> 5.303 Defective Materials All materials not the work, or the materials used in the work, or <br /> con To— <br /> on to t e requirements of 'these which in any way affect the conduct of the work, and <br /> specifications shall be considered as defective, and of all such orders and decrees of bodies or <br /> all such materials, whether in place or not, shall tribunals having any jurisdiction or authority over <br /> be rejected and shall be removed immediately from the same. <br /> the site of the work unless otherwise permitted by <br /> the City Engineer. 5.402 Labor Discrimination Attention is directed <br /> to Section 1735 of the Labor Code which reads as <br /> No rejected materials, the defects of which have follows: <br /> been subsequently corrected, shall be used until <br /> approved in writing by the City Engineer. 1735. No discrimination shall be made in <br /> the employment of persons upon public works <br /> Upon failure on the part of the Contractor to comply because of the race, religious creed, color, <br /> with an order of the City Engineer made under the national origin, ancestry, physical handicap, <br /> provisions of this section, the City Engineer shall medical condition, marital status, or sex <br /> have authority to remove and replace defective of such persons, except as provided in <br /> material and to deduct the cost of removal and Section 1420, and every Contractor for public <br /> replacement from any moneys due or to become due the works violating this section is subject to all <br /> Contractor. the penalties imposed for a violation of <br /> this chapter. <br /> 5.3 <br />