My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012666
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WINEMASTERS
>
1
>
3500 - Local Oversight Program
>
PR0545907
>
ARCHIVED REPORTS_XR0012666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:10:10 PM
Creation date
7/23/2020 2:54:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012666
RECORD_ID
PR0545907
PE
3528
FACILITY_ID
FA0005259
FACILITY_NAME
GUILD WINERY
STREET_NUMBER
1
STREET_NAME
WINEMASTERS
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04908033
CURRENT_STATUS
02
SITE_LOCATION
1 WINEMASTERS WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 3, 1986 <br /> Gordon Lee Boggs, Toxic Specialist <br /> California Regional Water Quality <br /> Control Board, Central Valley Region <br /> 3201 S Street <br /> Sacramento, CA 95816-7090 <br /> Dear Gordon: <br /> Attached is a copy of the soil investigation work plan prepared by <br /> J. H. Kleinfelder & Associates to pinpoint the extent of soil con- <br /> tamination in the area north of the main plant. A copy of this has <br /> been hand-delivered to Laurie Cotulla, and the necessary permits <br /> obtained to perform the boring on the days indicated. <br /> It is our understanding that Guild will be allowed to proceed <br /> with the installation of the champagne processing tank bases if no <br /> contamination is found under that location. <br /> Please rest assured that Guild will clean up the soil contamination <br /> ~w by one of the three methods that we discussed with Mr. Forgoer during <br /> your last visit. If the method chosen is to excavate the area and <br /> remove the soil , this will be done during the 28-day concrete curing <br /> cycle, if at all possible. At the very least, the area nearest the <br /> tank bases will be excavated and refilled with clean soil, so that <br /> the: tanks can be installed while further excavation takes place. <br /> If you have any questions in this matter; please feel free to contact <br /> Mr. Forquer or me. <br /> Sincerely, <br /> Ruben Moser <br /> Vice President <br /> Operations <br /> RM:ih <br /> Attachment <br /> cc: L. Cotullal� <br /> D. Forquer <br /> T TI <br /> G ULD Wineries and Distilleries One Winemrn <br /> asters'Way, Lodi, Califoia 95240 (249)368-5151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.