Laserfiche WebLink
r <br /> J• H. KLEINFEL©ER &ASSOCIATES <br /> File: W--2006-1 <br /> January 30, 1986 <br /> Page 2 <br /> A final report containing a description of work procedures, <br /> field observations, and an outline of the area of contamination <br /> will be prepared and submitted within two weeks after receipt of <br /> all analytical results. Since the majority of the analyses will <br /> be performed under routine turnaround conditions, the expectant <br /> work schedule is as follows: <br /> A. Collect soil samples around champagne tank area, submit <br /> samples for analyses and report finding., to Guild and the <br /> regulatory agencies: <br /> a Begin field work - February 4th (dependent on <br /> receiving approval to proceed) <br /> s Submit results -- February 7th. <br /> B. Begin more detailed soil assessment work around the tank <br /> excavation area (tentative schedule, actual start-up date <br /> will depend on your formal authorization to begin work) : <br /> �'. a Begin field work - February 5th <br /> e Complete field work - February 18th <br /> e Complete chemical analyses - March 6th (two weeks) <br /> m Complete draft investigative report - March 20th <br /> To perform this investigation we will require the following <br /> from Guild Wineries: <br /> Location of all underground utilities and other subsurface <br /> structures which could interfere with drilling operations <br /> or be damaged during drilling. Failure to locate such <br /> lines or structures and responsibility for any necessary <br /> corrective action or resulting damage will be the <br /> responsibility of Guild Wineries. Underground Service <br /> Alert (USA) (800) 642-2444 provides this service free of <br /> 1 charge for major utility 14nes. JHK&A will make contact <br />'" ---- - -with--USA-for-a--site-visit.- -However, Gui-Id-Wineries--at:-the -- - — -- <br /> site .must assit USA in their site inspection and supply <br /> their report to JHK&A before site mobilization. <br /> e Any necessary permits such as encroachment permits onto <br /> _. adjacent streets and if needed, temporary traffic controls <br /> to facilitate drilling operations. <br />