Laserfiche WebLink
26 November 2001 <br /> AGE-NC Project No. 9870492 <br /> Page 2 of 7 <br /> The lateral and vertical extent of impacted ground wat r has-not been defined. <br /> " 3.0.. SC.OPR OF.WORK <br /> Based on the analytical results from the previous roves igations, AGE proposes the installation of . <br /> -three ground water monitoring wells to assess and monitor the lateral extent of impacted ;round <br /> water. The assessment activities will-consist of the Poll "wing tasks: ; <br /> Permitting and pre-field work:activities; <br /> • Drilling and-soil sample collection; <br /> • Monitoring well"installation and development; <br /> Ground water sample collection; <br /> • Preparation of a report of findings. <br /> 3:1. . PERIVIITTING AND PRE-FIELD WORK AC IVtTIES <br /> Applicable site assessment permits.will be obtained from the PHS-EHD. In addition, an update to <br /> the health and safetyplan presently on-file,will be.prepared in accordance with Occupational Safety <br /> and Health Guidance Manual for. Hazardous .Wa to Site :Activities (National Institute for <br /> Occupational Safety and Health Administration, U. Coast Guard and US., Environmental <br /> Protection Agency, 1985). Prior ,to mobilization; e'ac .monuitoring well location willbe clearly <br /> marked and a utility clearance-obtained through Underground.Service Alert. <br /> . 3.2.- - DRILLING AND SOIL.SAMPLING, - <br /> AGE proposes to install three ground water monitoring ells at the"site as part of the site assessment. <br /> Proposed well locations are illustrated in Figure,2. <br /> Based on ground water contamination encountered in the soil borings advanced at the site, AGE <br /> proposes ground water monitoring wells in the f6flowing locations: <br /> • - Adjacent to soil boring P=9; <br /> f <br /> • Between 25 and 35 feet west of soil baring B- 0; and . <br /> Advanced GeoEnvir6nmental,Inc. <br />