Laserfiche WebLink
• 3� Ser_uraty <br /> All of the groundwater treatment system components are located on-site <br /> within a 6-foot high cyclone fence This fence was installed by ASE and its <br /> subcontractor Sunset Fencing, on September 27 and 28, 2000 A 24-hour <br /> answering service account has been set-up for the treatment system The <br /> phone number is located on two signs installed on the fenced enclosure <br /> Should someone call the number, in the event of an emergency, ASE <br /> personnel will be contacted immediately by the answering service so a <br /> solution to the problem can be achieved Personnel at the service station <br /> have a key to the security compound, and are aware of the location of the <br /> emergency shut-off switches <br />' 4 . 0 INITIAL SYSTEM START-UP <br /> Listed below in outline form are the mayor milestones completed during <br /> this project <br /> LEVENT DATF, <br /> Installation of recovery wells RW-1 & RW-3 9- 15-00 <br /> Excavation of trench for recovery well plumbing 9-20-00 <br /> Installation of recovery well and sewer discharge plumbing 9-20-00 <br /> Backfilling and resurfacing of trench 9-21-00 <br />' Received sewer discharge permit from City of Manteca 9-25.00 <br /> Arrival of remediation system equipment 9-26-00 <br /> Installation of security enclosure 9-27-00 <br />' Installation of electrical service for system 9-27-00 <br /> Completion of remediation system installation 9-28-00 <br /> Remediation system troubleshooting and training 9-29-00 <br /> Official System Start-up 9-29-00 <br />' Between September 26 and 27, 2000, the major components of the <br /> remediation system were delivered to the site and installed by ASE and its <br /> subcontractor Slaby Sales, Inc On September 28, 2000, after all of the <br /> components were plumbed together, the carbon vessels were filled <br /> completely with tap water to release all of the air in the vessels and lines <br /> The 500-gallon transfer tank was also filled to level switch capacity with <br /> tap water At the end of that day, the final electrical hook-up was made <br /> and the fence installation was completed With the permission of Mr <br />' Podesta of the City of Manteca, ASE let the system operate for several <br /> hours verifying the correct operation of all pumps, switches, gauges a n d <br /> . meters The water treated that day, approximately 3,000 gallons, was <br /> only tap water The system was shut-off at the end of the day Early i n <br /> Frank's One Stop Interim Remediation System Installation Report -- October 2000 <br />