Laserfiche WebLink
i <br /> ib . 0 MONTHLY REPORTING <br />' On a monthly basis, ASE will prepare a report that will detail the <br /> remediation system's performance during the past 30 days The report <br />' <br /> will include the information gathered by ASE during its every-other-day <br /> visits to the site (gallons treated, vacuum at each well, water depth in <br /> recovery wells, influent and effluent water concentrations, notes <br />' regarding system operation and maintenance performed) The log sheet <br /> used by ASE will be included in each report as well as the tabulated <br /> analytical data of the influent and effluent samples This monthly report <br /> rwill be issued by the second week of the subsequent month that the <br /> report details <br />' Should you have any questions or comments, please feel free to call us at <br /> (925) 820-9391 <br /> Respectfully submitted, <br />' AQUA SCIENCE ENGINEERS, INC <br /> aA--� <br /> li <br /> 1 <br /> David Allen <br /> 1 Senior Project Manager pC'FO <br /> l <br /> 17 <br /> 0 Nva <br /> F <br /> OF C ALFo' <br /> Robert E Kitay, R G , R E A <br /> Senior Geologist <br /> Cc Mr Frank Guinta <br /> Mr Don Thompson <br />' Mr Ron Rowe, San Joaquin PHS-EHD <br /> Mr Marty Hartzell, RWQCB <br /> Mr Jim Podesta, City of Manteca Public Works Department <br /> Frank's One Stop Interim Remediation System Installation Report — October 2000 <br />