My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003681
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
ARCHIVED REPORTS_XR0003681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:46:58 PM
Creation date
7/23/2020 4:11:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003681
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s� <br /> • 5 . 0 DETAILS OF SECTION iI — ADDITIONAL WELL INSTALLATION <br /> TASK I- OBTAIN NECESSARY PERMITS <br /> ASE will obtain a drilling permit from the San Joaquin County PHS-EHD <br /> and an encroachment permit from the City on Manteca to allow for the <br /> installation of monitoring wells in the city street <br /> Our client and the San Joaquin County PHS-EHD will be notified of the <br /> drilling date at least 48 hours prior to all scheduled field work ASE will <br /> also notify Underground Service Alert (USA) of the project at least 4 8 <br /> hours prior to subsurface drilling to have underground utility lines <br /> marked in the site vicinity <br /> TASK 2 - DRILL TWO CPT SOIL BORINGS AT THE SITE <br /> ASE will drill two (2) soil borings at the site to approximately 120-feet b g s <br /> using a CPT One of these borings will be drilled near monitoring well <br /> MW-13, downgradient of the site (based on the groundwater flow <br /> direction in the shallow zone) and the other boring will be drilled near the <br /> ® eastern property line (the downgradient edge of the property in the 55 to <br /> 70-foot bgs zone) The location of these borings is shown on Figure 4 <br /> The purpose of these borings is to determine the lithologic conditions in <br /> these locations to properly design groundwater monitoring wells <br /> TASK 3 - DRILL TWO SOIL BORINGS AT THE SITE TO A DEPTH OF 70-FEET <br /> BGS AND INSTALL GROUNDWATER MONITORING WELLS IN <br /> THESE BORINGS TO SCREEN THE WATER BEARING ZONE 55 TO <br /> 70-FEET BGS <br /> ASE will drill two (2) soil borings at the site to approximately 70-feet bgs <br /> using a hollow-stem auger drill rig for the installation of monitoring wells <br /> screened near the 55 to 70-feet bgs depth zone One of these monitoring <br /> wells will be drilled near monitoring well MW-13 downgradient of the site <br /> (based on the groundwater flow direction in the shallow zone) to monitor <br /> the vertical extent of contamination at that location The other <br /> monitoring well will be drilled near the eastern property line (the <br /> downgradient edge of the property in the 55 to 70-foot bgs zone) to <br /> monitor the vertical extent of contamination at that location The <br /> proposed locations of these monitoring wells is shown on Figure 4 <br /> Since CPT borings will have been drilled in these locations, the bottom of <br /> the augers will be plugged with a wooden plug and no soil samples will b e <br /> Frank's One Stop Workplan — June 2000 <br /> -11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.